Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: gen voltage constraint
- No Voltage Constraint
- Operator note: genconstraint
- Green
- Operator note: gsp hm constraint manual
- R
- Operator note: rag colour
- green
- Operator note: source field
- genhr
- Operator note: upgenconst
- Upstream Constraint
- Operator note: worst case constraint gen colour
- Green
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.96 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.96 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.96 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.42 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.42 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.42 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.19 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.19 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 35.19 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.58 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.58 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.58 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.5 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.5 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 34.5 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 33.67 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 33.67 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 33.67 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32.81 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32.81 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32.81 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 32 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 31.2 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 31.2 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 31.2 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 30.54 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 30.5 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 30.28 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 30.87 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 29.25 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 29.12 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 31.7 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 27.99 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 27.83 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 31.26 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 26.1 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 25.83 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Contracted
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_heatmap_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- gentot
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 28 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: dem voltage constraint
- No Voltage Constraint
- Operator note: demconstraint
- Green
- Operator note: gsp hm constraint manual
- R
- Operator note: rag colour
- green
- Operator note: source field
- demhr
- Operator note: updemconst
- Upstream Constraint
- Operator note: worst case constraint dem colour
- Green
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 22.01 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 22.01 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 22.01 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.73 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.73 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.73 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.37 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.37 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 21.37 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.97 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.97 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.97 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.48 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.48 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 20.48 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.92 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.92 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.92 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.28 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.28 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 19.28 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 18.56 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 18.56 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 18.56 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 17.78 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 17.78 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 17.78 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 16.95 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 16.89 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 16.6 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 13.8 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 12.25 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 11.84 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 12.09 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 9.92 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 9.62 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 11.35 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 8.74 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 8.62 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Contracted
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demtot
Offtake · Load (any) · Total
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 36 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- firm_cap