Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 21.826461554 MW under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: gen voltage constraint
- No Voltage Constraint
- Operator note: genconstraint
- Red - Fault Level
- Operator note: gsp hm constraint manual
- R
- Operator note: rag colour
- red
- Operator note: source field
- genhr
- Operator note: upgenconst
- GSP Constraint
- Operator note: worst case constraint gen colour
- Red
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2026
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2027
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2028
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2029
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2030
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2031
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2032
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2033
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2034
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2035
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2040
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2045
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- generation_headroom_capacity_mw_2050
Injection · Generation (any) · Contracted
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_heatmap_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- gentot
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 5.779999733 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: dem voltage constraint
- No Voltage Constraint
- Operator note: demconstraint
- Red - Fault Level
- Operator note: gsp hm constraint manual
- R
- Operator note: rag colour
- red
- Operator note: source field
- demhr
- Operator note: updemconst
- No
- Operator note: worst case constraint dem colour
- Red
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.18 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.18 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.18 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2026 (2026) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2026
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.02 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.02 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 3.02 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2027 (2027) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2027
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.74 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.74 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.74 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2028 (2028) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2028
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.43 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.43 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 2.43 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2029 (2029) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2029
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.95 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.95 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.95 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2030 (2030) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2030
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.47 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.47 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.47 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2031 (2031) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2031
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2032 (2032) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2032
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.64 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.64 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.64 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2033 (2033) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2033
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0.11 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2034 (2034) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2034
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2035 (2035) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2035
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2040 (2040) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2040
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2045 (2045) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2045
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Electric Engagement
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Holistic Transition
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology gb_npg_nhr_2026.
- Firmness
- Unknown
- Horizon
- 2050 (2050) · scenario: DFES 2026 - Hydrogen Evolution
- Methodology
- gb_npg_nhr_2026NPg Network Development Plan — Network Headroom Report (DFES 2026)basis operator calculated · network state unknown · comparability class gb_npg_nhrNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 24 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-04-24)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demand_headroom_capacity_mw_2050
Offtake · Load (any) · Contracted
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- demtot
Offtake · Load (any) · Total
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 19 MVA under methodology gb_npg_heatmap_2026.
- Firmness
- Firm
- Horizon
- Now (snapshot)
- Methodology
- gb_npg_heatmap_2026Northern Powergrid heat-map data: thermal headroombasis operator calculated · network state unknown · comparability class gb_npg_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 27 Jul 2026
- Retrieved / confirmed
- 2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
- Source health
- Healthy
- Licence
- Northern Powergrid Open Data Licence v1.0Attribution:
Supported by Northern Powergrid Open Data (last updated 2026-07-27)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- firm_cap