ARI Aarle Rixtel

Enexis Netbeheer · Noord-Brabant, Netherlands

Latest published values

8 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Contracted112.690116 MWFirmNow (snapshot)7 Sep 2026
InjectionGeneration (any)Total98.51 MWFirmNow (snapshot)7 Sep 2026
InjectionGeneration (any)Waitlisted69.839 MWFirmNow (snapshot)7 Sep 2026
InjectionGeneration (any)Waitlisted59FirmNow (snapshot)variant: requests7 Sep 2026
OfftakeLoad (any)Contracted71.733434 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Total108.77 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted48.797 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted95FirmNow (snapshot)variant: requests7 Sep 2026

gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Contracted

112.690116 MW

Granted

The operator's latest published dataset reports 112.6901155783415 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Injection · Generation (any) · Total

98.51 MW

Granted

The operator's latest published dataset reports 98.51 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Injection · Generation (any) · Waitlisted

69.839 MW

Granted

The operator's latest published dataset reports 69.839 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Injection · Generation (any) · Waitlisted

59

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 59 count under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031
Operator note: variant
requests

Offtake · Load (any) · Contracted

71.733434 MW

Granted

The operator's latest published dataset reports 71.73343355197144 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Offtake · Load (any) · Total

108.77 MW

Granted

The operator's latest published dataset reports 108.77 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Offtake · Load (any) · Waitlisted

48.797 MW

Granted

The operator's latest published dataset reports 48.797 MW under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031

Offtake · Load (any) · Waitlisted

95

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 95 count under methodology nl_nbnl_voedingsgebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_voedingsgebieden_v2Capaciteitskaart: DSO transport capacity, contracted peak need and queue per supply areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_rnb_mvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-26 08:57 UTC
Source health
Healthy
Provenance
nl_nbnl_voedingsgebiedenrecord ARI · payload sha256 1c9e50c4ea2a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal — Algemene gebruiksvoorwaarden (Open omgeving)Attribution: gezamenlijke netbeheerders 2026 — de gezamenlijke regionale netbeheerders behouden hun intellectuele eigendomsrechten (zoals het databankenrecht) (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaar
2026
Operator note: jaartal opgelost
2031
Operator note: variant
requests

History

Served series only

Offtake · Load (any) · Total

current 108.77 MW

26 Sep 2026: 108.77 MW
26 Sep 2026range 108.77–108.77 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current108.77 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted

current 71.733434 MW

26 Sep 2026: 71.733434 MW
26 Sep 2026range 71.733434–71.733434 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current71.733434 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Waitlisted

current 48.797 MW

26 Sep 2026: 48.797 MW
26 Sep 2026range 48.797–48.797 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current48.797 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Waitlisted

current 95

26 Sep 2026: 95
26 Sep 2026range 95–9526 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current95

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 98.51 MW

26 Sep 2026: 98.51 MW
26 Sep 2026range 98.51–98.51 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current98.51 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted

current 112.690116 MW

26 Sep 2026: 112.690116 MW
26 Sep 2026range 112.690116–112.690116 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current112.690116 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Waitlisted

current 69.839 MW

26 Sep 2026: 69.839 MW
26 Sep 2026range 69.839–69.839 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current69.839 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Waitlisted

current 59

26 Sep 2026: 59
26 Sep 2026range 59–5926 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current59

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq773rxvnkb00yg2k3qcy10/capacity" \  -H "Authorization: Bearer gc_live_..."
ARI Aarle Rixtel congestion zone: grid capacity (Enexis Netbeheer) · GridCapacity API