Latest published values

10 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available13.4 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Available15 MVAUnknownNow (snapshot)variant: reverse_power_flow1 Mar 2025
InjectionGeneration (any)Requested28.8 MVAUnknownpast_connection_activityvariant: budget_estimates_provided1 Mar 2025
InjectionGeneration (any)Requested3Unknownpast_connection_activityvariant: budget_estimates_provided_count1 Mar 2025
InjectionGeneration (any)Requested9 MVAUnknownpast_connection_activityvariant: connection_offers_made1 Mar 2025
InjectionGeneration (any)Requested1Unknownpast_connection_activityvariant: connection_offers_made_count1 Mar 2025
InjectionGeneration (any)Total15.6 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Total15 MVAFirmNow (snapshot)variant: reverse_power_flow1 Mar 2025
OfftakeLoad (any)Available5.9 MVAFirmNow (snapshot)1 Mar 2025
OfftakeLoad (any)Total15 MVAFirmNow (snapshot)1 Mar 2025

UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

13.4 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 13.4 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
generationAvailableCapacity

Injection · Generation (any) · Available

15 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 15 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: equals published total
reversePowerFlowTotalCapacity
Operator note: source field
reversePowerFlowAvailableCapacity

Injection · Generation (any) · Requested

28.8 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 28.8 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895/PastConnectionActivity/11kV · payload sha256 3c5d0a13729f…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
generationBudgetEstimatesProvidedCapacity

Injection · Generation (any) · Requested

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895/PastConnectionActivity/11kV · payload sha256 3c5d0a13729f…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
generationBudgetEstimatesProvidedCount

Injection · Generation (any) · Requested

9 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895/PastConnectionActivity/11kV · payload sha256 3c5d0a13729f…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
generationConnectionOffersMadeCapacity

Injection · Generation (any) · Requested

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895/PastConnectionActivity/11kV · payload sha256 3c5d0a13729f…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
generationConnectionOffersMadeCount

Injection · Generation (any) · Total

15.6 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 15.6 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
generationFirmCapacity

Injection · Generation (any) · Total

15 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 15 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
reversePowerFlowTotalCapacity

Offtake · Load (any) · Available

5.9 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5.9 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
demandAvailableCapacity

Offtake · Load (any) · Total

15 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 15 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 0f670a59-0e43-5d0a-a592-6d8f052ad895 · payload sha256 855539922631…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
demandFirmCapacity

History

Served series only

Offtake · Load (any) · Available

current 5.9 MVA

26 Sep 2026: 5.9 MVA
26 Sep 2026range 5.9–5.9 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.9 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 13.4 MVA

26 Sep 2026: 13.4 MVA
26 Sep 2026range 13.4–13.4 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current13.4 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 15 MVA

26 Sep 2026: 15 MVA
26 Sep 2026range 15–15 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current15 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current 15 MVA

26 Sep 2026: 15 MVA
26 Sep 2026range 15–15 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current15 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 15.6 MVA

26 Sep 2026: 15.6 MVA
26 Sep 2026range 15.6–15.6 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current15.6 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 15 MVA

26 Sep 2026: 15 MVA
26 Sep 2026range 15–15 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current15 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested · past_connection_activity

current 28.8 MVA

26 Sep 2026: 28.8 MVA
26 Sep 2026range 28.8–28.8 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current28.8 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested · past_connection_activity

current 3

26 Sep 2026: 3
26 Sep 2026range 3–326 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested · past_connection_activity

current 9 MVA

26 Sep 2026: 9 MVA
26 Sep 2026range 9–9 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current9 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested · past_connection_activity

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq75qqntah1g4cf9b93x19g/capacity" \  -H "Authorization: Bearer gc_live_..."
Rickinghall Primary 11kV substation: grid capacity (UK Power Networks) · GridCapacity API