Substation · 11 kV · primary

Holywell Grid 11kV

UK Power Networks · United Kingdom

Latest published values

12 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available103.3 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Available72 MVAUnknownNow (snapshot)variant: reverse_power_flow1 Mar 2025
InjectionGeneration (any)Total107.5 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Total72 MVAFirmNow (snapshot)variant: reverse_power_flow1 Mar 2025
OfftakeLoad (any)Available26.8 MVAFirmNow (snapshot)1 Mar 2025
OfftakeLoad (any)Contracted13.4 MVAUnknownpast_connection_activityvariant: connection_offers_accepted1 Mar 2025
OfftakeLoad (any)Contracted3Unknownpast_connection_activityvariant: connection_offers_accepted_count1 Mar 2025
OfftakeLoad (any)Requested21 MVAUnknownpast_connection_activityvariant: budget_estimates_provided1 Mar 2025
OfftakeLoad (any)Requested2Unknownpast_connection_activityvariant: budget_estimates_provided_count1 Mar 2025
OfftakeLoad (any)Requested2.5 MVAUnknownpast_connection_activityvariant: connection_offers_made1 Mar 2025
OfftakeLoad (any)Requested1Unknownpast_connection_activityvariant: connection_offers_made_count1 Mar 2025
OfftakeLoad (any)Total72 MVAFirmNow (snapshot)1 Mar 2025

UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

103.3 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 103.3 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
generationAvailableCapacity

Injection · Generation (any) · Available

72 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 72 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: equals published total
reversePowerFlowTotalCapacity
Operator note: source field
reversePowerFlowAvailableCapacity

Injection · Generation (any) · Total

107.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 107.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
generationFirmCapacity

Injection · Generation (any) · Total

72 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 72 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
reversePowerFlowTotalCapacity

Offtake · Load (any) · Available

26.8 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 26.8 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
demandAvailableCapacity

Offtake · Load (any) · Contracted

13.4 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 13.4 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCapacity

Offtake · Load (any) · Contracted

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCount

Offtake · Load (any) · Requested

21 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 21 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadBudgetEstimatesProvidedCapacity

Offtake · Load (any) · Requested

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadBudgetEstimatesProvidedCount

Offtake · Load (any) · Requested

2.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2.5 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCapacity

Offtake · Load (any) · Requested

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540/PastConnectionActivity/11kV · payload sha256 af4fba9a72ee…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCount

Offtake · Load (any) · Total

72 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 72 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 887e3625-c415-5b39-8e17-dc0be1500540 · payload sha256 a51374e0d324…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
demandFirmCapacity

History

Served series only

Offtake · Load (any) · Available

current 26.8 MVA

26 Sep 2026: 26.8 MVA
26 Sep 2026range 26.8–26.8 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current26.8 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 103.3 MVA

26 Sep 2026: 103.3 MVA
26 Sep 2026range 103.3–103.3 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current103.3 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 72 MVA

26 Sep 2026: 72 MVA
26 Sep 2026range 72–72 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current72 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current 72 MVA

26 Sep 2026: 72 MVA
26 Sep 2026range 72–72 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current72 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 107.5 MVA

26 Sep 2026: 107.5 MVA
26 Sep 2026range 107.5–107.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current107.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 72 MVA

26 Sep 2026: 72 MVA
26 Sep 2026range 72–72 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current72 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 21 MVA

26 Sep 2026: 21 MVA
26 Sep 2026range 21–21 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current21 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 2

26 Sep 2026: 2
26 Sep 2026range 2–226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 2.5 MVA

26 Sep 2026: 2.5 MVA
26 Sep 2026range 2.5–2.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 13.4 MVA

26 Sep 2026: 13.4 MVA
26 Sep 2026range 13.4–13.4 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current13.4 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 3

26 Sep 2026: 3
26 Sep 2026range 3–326 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq75qqntah1g4ccsthvf9jg/capacity" \  -H "Authorization: Bearer gc_live_..."
Holywell Grid 11kV substation: grid capacity (UK Power Networks) · GridCapacity API