Skip to content
GridCapacityAPI.com

Substation · 11 kV · primary

Gorringe Park 11kV

UK Power Networks · United Kingdom

Latest published values

10 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available57 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Available58.5 MVAUnknownNow (snapshot)variant: reverse_power_flow1 Mar 2025
InjectionGeneration (any)Total61.7 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Total58.5 MVAFirmNow (snapshot)variant: reverse_power_flow1 Mar 2025
OfftakeLoad (any)Available19 MVAFirmNow (snapshot)1 Mar 2025
OfftakeLoad (any)Contracted1.2 MVAUnknownpast_connection_activityvariant: connection_offers_accepted1 Mar 2025
OfftakeLoad (any)Contracted1Unknownpast_connection_activityvariant: connection_offers_accepted_count1 Mar 2025
OfftakeLoad (any)Requested6 MVAUnknownpast_connection_activityvariant: connection_offers_made1 Mar 2025
OfftakeLoad (any)Requested4Unknownpast_connection_activityvariant: connection_offers_made_count1 Mar 2025
OfftakeLoad (any)Total58.5 MVAFirmNow (snapshot)1 Mar 2025

UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

57 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 57 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
generationAvailableCapacity

Injection · Generation (any) · Available

58.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 58.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: equals published total
reversePowerFlowTotalCapacity
Operator note: source field
reversePowerFlowAvailableCapacity

Injection · Generation (any) · Total

61.7 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 61.7 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
generationFirmCapacity

Injection · Generation (any) · Total

58.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 58.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
reversePowerFlowTotalCapacity

Offtake · Load (any) · Available

19 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 19 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
demandAvailableCapacity

Offtake · Load (any) · Contracted

1.2 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1.2 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1/PastConnectionActivity/11kV · payload sha256 0151c5c25797…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCapacity

Offtake · Load (any) · Contracted

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1/PastConnectionActivity/11kV · payload sha256 0151c5c25797…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCount

Offtake · Load (any) · Requested

6 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 6 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1/PastConnectionActivity/11kV · payload sha256 0151c5c25797…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCapacity

Offtake · Load (any) · Requested

4

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 4 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1/PastConnectionActivity/11kV · payload sha256 0151c5c25797…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCount

Offtake · Load (any) · Total

58.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 58.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 9c8f0127-084f-5db7-b48a-97196278ebe1 · payload sha256 f020ac962c21…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
demandFirmCapacity

History

Served series only

Offtake · Load (any) · Available

current 19 MVA

26 Sep 2026: 19 MVA
26 Sep 2026range 19–19 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current19 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 57 MVA

26 Sep 2026: 57 MVA
26 Sep 2026range 57–57 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current57 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 58.5 MVA

26 Sep 2026: 58.5 MVA
26 Sep 2026range 58.5–58.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current58.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current 58.5 MVA

26 Sep 2026: 58.5 MVA
26 Sep 2026range 58.5–58.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current58.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 61.7 MVA

26 Sep 2026: 61.7 MVA
26 Sep 2026range 61.7–61.7 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current61.7 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 58.5 MVA

26 Sep 2026: 58.5 MVA
26 Sep 2026range 58.5–58.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current58.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 6 MVA

26 Sep 2026: 6 MVA
26 Sep 2026range 6–6 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 4

26 Sep 2026: 4
26 Sep 2026range 4–426 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 1.2 MVA

26 Sep 2026: 1.2 MVA
26 Sep 2026range 1.2–1.2 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1.2 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq75qqntah1g4c85t260mq0/capacity" \  -H "Authorization: Bearer gc_live_..."
Gorringe Park 11kV substation: grid capacity (UK Power Networks) · GridCapacity API