Fourstones 275/20kV

Northern Powergrid · Northeast, United Kingdom

Latest published values

5 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Total90.4 MWConditionalNow (snapshot)season: all19 Feb 2026
OfftakeLoad (any)Total-29.8 MWConditionalNow (snapshot)season: winter19 Feb 2026
OfftakeLoad (any)Total-30 MWConditionalNow (snapshot)season: access_period19 Feb 2026
OfftakeLoad (any)Total-31.3 MWConditionalNow (snapshot)season: summer19 Feb 2026
UnknownUnknownConnected108.6 MWUnknownNow (snapshot)19 Feb 2026

Supported by Northern Powergrid Open Data (last updated 2026-02-19)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Total

90.4 MW

Granted

The operator's latest published dataset reports 90.4 MW under methodology gb_npg_gsp_connection_info_2026.

Firmness
Conditional
Horizon
Now (snapshot) · season: all
Methodology
gb_npg_gsp_connection_info_2026NPg Grid Supply Point Connection Informationbasis operator published · network state unknown · comparability class gb_technical_limits_npgNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
19 Feb 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
Source health
Healthy
Licence
Northern Powergrid Open Data Licence v1.0Attribution: Supported by Northern Powergrid Open Data (last updated 2026-02-19)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: period
entire year
Operator note: source field
gsp_technical_export_limit
Operator note: technical limits enabled
Yes

Offtake · Load (any) · Total

-29.8 MW

Granted

The operator's latest published dataset reports -29.8 MW under methodology gb_npg_gsp_connection_info_2026.

Firmness
Conditional
Horizon
Now (snapshot) · season: winter
Methodology
gb_npg_gsp_connection_info_2026NPg Grid Supply Point Connection Informationbasis operator published · network state unknown · comparability class gb_technical_limits_npgNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
19 Feb 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
Source health
Healthy
Licence
Northern Powergrid Open Data Licence v1.0Attribution: Supported by Northern Powergrid Open Data (last updated 2026-02-19)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: negative value
true
Operator note: period
December - February
Operator note: sign convention
import limits are published as negative numbers
Operator note: source field
gsp_technical_import_limit_winter
Operator note: technical limits enabled
Yes

Offtake · Load (any) · Total

-30 MW

Granted

The operator's latest published dataset reports -30 MW under methodology gb_npg_gsp_connection_info_2026.

Firmness
Conditional
Horizon
Now (snapshot) · season: access_period
Methodology
gb_npg_gsp_connection_info_2026NPg Grid Supply Point Connection Informationbasis operator published · network state unknown · comparability class gb_technical_limits_npgNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
19 Feb 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
Source health
Healthy
Licence
Northern Powergrid Open Data Licence v1.0Attribution: Supported by Northern Powergrid Open Data (last updated 2026-02-19)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: negative value
true
Operator note: period
March - May and September - November
Operator note: sign convention
import limits are published as negative numbers
Operator note: source field
gsp_technical_import_limit_access_period
Operator note: technical limits enabled
Yes

Offtake · Load (any) · Total

-31.3 MW

Granted

The operator's latest published dataset reports -31.3 MW under methodology gb_npg_gsp_connection_info_2026.

Firmness
Conditional
Horizon
Now (snapshot) · season: summer
Methodology
gb_npg_gsp_connection_info_2026NPg Grid Supply Point Connection Informationbasis operator published · network state unknown · comparability class gb_technical_limits_npgNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
19 Feb 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
Source health
Healthy
Licence
Northern Powergrid Open Data Licence v1.0Attribution: Supported by Northern Powergrid Open Data (last updated 2026-02-19)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: negative value
true
Operator note: period
June - October
Operator note: sign convention
import limits are published as negative numbers
Operator note: source field
gsp_technical_import_limit_summer
Operator note: technical limits enabled
Yes

Unknown · Unknown · Connected

108.6 MW

Granted

The operator's latest published dataset reports 108.6 MW under methodology gb_npg_gsp_connection_info_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
gb_npg_gsp_connection_info_2026NPg Grid Supply Point Connection Informationbasis operator published · network state unknown · comparability class gb_technical_limits_npgNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
19 Feb 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-09-26 02:45 UTC
Source health
Healthy
Licence
Northern Powergrid Open Data Licence v1.0Attribution: Supported by Northern Powergrid Open Data (last updated 2026-02-19)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
connected_capacity_to_date_mw

History

Served series only

Unknown · Unknown · Connected

current 108.6 MW

26 Sep 2026: 108.6 MW
26 Sep 2026range 108.6–108.6 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current108.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 90.4 MW

26 Sep 2026: 90.4 MW
26 Sep 2026range 90.4–90.4 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current90.4 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current -29.8 MW

26 Sep 2026: -29.8 MW
26 Sep 2026range -29.8–-29.8 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current-29.8 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current -31.3 MW

26 Sep 2026: -31.3 MW
26 Sep 2026range -31.3–-31.3 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current-31.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current -30 MW

26 Sep 2026: -30 MW
26 Sep 2026range -30–-30 MW26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current-30 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6kfcdst1dzf26w59s5t0w/capacity" \  -H "Authorization: Bearer gc_live_..."
Fourstones 275/20kV substation: grid capacity (Northern Powergrid) · GridCapacity API