NPg Grid Supply Point Connection Information
gb_npg_gsp_connection_info_2026 · v2026-02GSP technical limits as NPg publishes them: an export limit calculated from the gross GSP minimum demand at the four cardinal points (best case taken), and import limits for three periods of the year; plus connected capacity and the transmission-distribution reverse power limit.
- Capacity basis
- operator published
- Network state
- unknown
- Binding
- No
- Additive across assets
- No — do not sum these figures
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Comparability class
- gb_technical_limits_npg
- Documentation
- Operator’s method (opens the operator’s site)
The operator’s own caveats
- These technical limits are calculated based on the gross GSP minimum demand (not including contribution from embedded power stations).
- customers' generation may be curtailed to limit power flow in the reverse direction through these transformers