Substation · 11 kV · primary

Churchfields 11kV

UK Power Networks · United Kingdom

Latest published values

12 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available54.4 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Available53.5 MVAUnknownNow (snapshot)variant: reverse_power_flow1 Mar 2025
InjectionGeneration (any)Total57.4 MVAFirmNow (snapshot)1 Mar 2025
InjectionGeneration (any)Total53.5 MVAFirmNow (snapshot)variant: reverse_power_flow1 Mar 2025
OfftakeLoad (any)Available18.4 MVAFirmNow (snapshot)1 Mar 2025
OfftakeLoad (any)Contracted2.9 MVAUnknownpast_connection_activityvariant: connection_offers_accepted1 Mar 2025
OfftakeLoad (any)Contracted2Unknownpast_connection_activityvariant: connection_offers_accepted_count1 Mar 2025
OfftakeLoad (any)Requested2 MVAUnknownpast_connection_activityvariant: budget_estimates_provided1 Mar 2025
OfftakeLoad (any)Requested1Unknownpast_connection_activityvariant: budget_estimates_provided_count1 Mar 2025
OfftakeLoad (any)Requested10.2 MVAUnknownpast_connection_activityvariant: connection_offers_made1 Mar 2025
OfftakeLoad (any)Requested7Unknownpast_connection_activityvariant: connection_offers_made_count1 Mar 2025
OfftakeLoad (any)Total53.5 MVAFirmNow (snapshot)1 Mar 2025

UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

54.4 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 54.4 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
generationAvailableCapacity

Injection · Generation (any) · Available

53.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 53.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: equals published total
reversePowerFlowTotalCapacity
Operator note: source field
reversePowerFlowAvailableCapacity

Injection · Generation (any) · Total

57.4 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 57.4 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
generationFirmCapacity

Injection · Generation (any) · Total

53.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 53.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot) · variant: reverse_power_flow
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
reversePowerFlowTotalCapacity

Offtake · Load (any) · Available

18.4 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 18.4 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: limiting factor
Thermal
Operator note: rag
GREEN
Operator note: rag colour
green
Operator note: source field
demandAvailableCapacity

Offtake · Load (any) · Contracted

2.9 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2.9 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCapacity

Offtake · Load (any) · Contracted

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_accepted_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersAcceptedCount

Offtake · Load (any) · Requested

2 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadBudgetEstimatesProvidedCapacity

Offtake · Load (any) · Requested

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: budget_estimates_provided_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadBudgetEstimatesProvidedCount

Offtake · Load (any) · Requested

10.2 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 10.2 MVA under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCapacity

Offtake · Load (any) · Requested

7

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 7 count under methodology gb_ukpn_ltds_heatmap_activity_2026.

Firmness
Unknown
Horizon
past_connection_activity · variant: connection_offers_made_count
Methodology
gb_ukpn_ltds_heatmap_activity_2026UKPN past connection activity (LTDS Capacity Heatmap)basis operator published · network state unknown · comparability class gb_ukpn_connection_activityNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464/PastConnectionActivity/11kV · payload sha256 bee966ae1f10…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: connection voltage kv
11
Operator note: source field
loadConnectionOffersMadeCount

Offtake · Load (any) · Total

53.5 MVA

Published in MVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 53.5 MVA under methodology gb_ukpn_ltds_heatmap_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_ukpn_ltds_heatmap_2026UKPN LTDS Capacity Heatmap: headroom from the Network Scenario Headroom Reportbasis operator calculated · network state n minus 1 · comparability class gb_ukpn_ltds_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
1 Mar 2025
Retrieved / confirmed
2026-09-26 02:47 UTClast confirmed unchanged 2026-09-26 02:47 UTC
Source health
Healthy
Provenance
gb_ukpn_ltds_heatmaprecord 3bc3b194-d5d9-5df9-befb-e11b1b142464 · payload sha256 5f5a464e39e0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: UK Power Networks, Long Term Development Statement (LTDS) Capacity Heatmap, https://ukpowernetworks.opendatasoft.com/explore/dataset/ukpn-capacity-heatmap/ (last updated 2025-03-01)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
demandFirmCapacity

History

Served series only

Offtake · Load (any) · Available

current 18.4 MVA

26 Sep 2026: 18.4 MVA
26 Sep 2026range 18.4–18.4 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current18.4 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 54.4 MVA

26 Sep 2026: 54.4 MVA
26 Sep 2026range 54.4–54.4 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current54.4 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 53.5 MVA

26 Sep 2026: 53.5 MVA
26 Sep 2026range 53.5–53.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total

current 53.5 MVA

26 Sep 2026: 53.5 MVA
26 Sep 2026range 53.5–53.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 57.4 MVA

26 Sep 2026: 57.4 MVA
26 Sep 2026range 57.4–57.4 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current57.4 MVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 53.5 MVA

26 Sep 2026: 53.5 MVA
26 Sep 2026range 53.5–53.5 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.5 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 2 MVA

26 Sep 2026: 2 MVA
26 Sep 2026range 2–2 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 10.2 MVA

26 Sep 2026: 10.2 MVA
26 Sep 2026range 10.2–10.2 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current10.2 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested · past_connection_activity

current 7

26 Sep 2026: 7
26 Sep 2026range 7–726 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current7

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 2.9 MVA

26 Sep 2026: 2.9 MVA
26 Sep 2026range 2.9–2.9 MVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2.9 MVA

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · past_connection_activity

current 2

26 Sep 2026: 2
26 Sep 2026range 2–226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.