Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_OCUPADA
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: module scope
- MGE: all power-generating modules (MGES + MPE, generation and storage)
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_con_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_sin_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: gen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: module scope
- GEN: generation installations, storage excluded
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 370 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to power park modules (MPE) only
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_DISPONIBLE_MPE
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_DISPONIBLE_MGES
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
- Operator note: shared capacity zone
- D10_SEPE
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_margen_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_margen_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ADMITIDA_NO_RESUELTA
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_con_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_sin_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: gen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 811 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
- Operator note: shared capacity zone
- D10_SEPE
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 408 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 370 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to power park modules (MPE) only
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_maximo
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Total
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_limitacion_interna
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
- Operator note: shared capacity zone
- D10_SEPE
- Operator note: source label
- N/A
Injection · Generation (any) · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: alm
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ALM_DISPONIBLE_MPE
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ALM_DISPONIBLE_MGES
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- D_Zona
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Injection · Other storage · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: alm
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Total
GrantedThe operator's latest published dataset reports 429 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Injection · Other storage · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: adicional_valor_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_wscr
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd_fuera_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: ch_rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: sh_rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: ch_aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: sh_aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 537 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico1_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic 1: CEP demand with voltage-dip ride-through, and non-CEP demand
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 388 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to demand with a power-electronics interface (CEP) only
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico2_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic 2: CEP demand without voltage-dip ride-through
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Reserved
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: valor_referencia_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reference value agreed with dso
- NO
- Operator note: reserved for
- consumption of the underlying distribution network (reference value)
- Operator note: source label
- blank
Offtake · Load (any) · Total
GrantedThe operator's latest published dataset reports 388 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to demand with a power-electronics interface (CEP) only
Offtake · Load (any) · Total
GrantedThe operator's latest published dataset reports 106 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Unknown
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
Offtake · Load (any) · Unknown
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
Offtake · Load (any) · Unknown
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: adicional_valor_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd_fuera_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 41 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Offtake · Other storage · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
- Operator note: temporary access limitation
- No
Offtake · Other storage · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Total
GrantedThe operator's latest published dataset reports 218 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E244_SEPE, E279_SEPE
Offtake · Other storage · Unknown
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank
Offtake · Other storage · Unknown
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: not published
- true
- Operator note: reason not grantable
- Valor de referencia no acordado. Valor de referencia no acordado en la zona estática.
- Operator note: source label
- blank