es_ree_demand_access_capacity

REE: Capacidad de acceso de demanda en la red de transporte

Published by Red Eléctrica de España, S.A.U. / ES / Monthly

Grantedcommercial_use_with_attributionFailing

Demand and storage (offtake) access capacity in MW at each of REE's 937 transmission nodes, from its monthly study: nodal capacity and margin by criterion, the reference value reserved for the underlying DSO, granted and pending capacity by demand type, the gross margin, the capacity not grantable with REE's reason, and the capacity available for requests under the general criterion.

REE: Capacidad de acceso de demanda en la red de transporte on a map

The 936 located assets in this publication, coloured by the spare capacity Red Eléctrica de España, S.A.U. publishes for each today. Click a point for its figure.

The map of Europe →

Loading the map…

What is withheld, and why

Nothing is withheld. Values are served with the attribution the licence asks for: Fuente: Red Eléctrica de España (REE), capacidad de acceso. Keep it with any figure you show.

Switched to commercial_use_with_attribution on 2026-10-02 on the owner's report that the operator gave permission by telephone. No written confirmation is on file: ask for one, and an objection from the operator means rights_override = blocked the same day. The evidence below is the operator's published terms as read before the call. Before: REE's legal notice claims the site's information including its databases; exploitation needs prior written authorisation, and reuse citing REE is allowed only for informative, non-commercial purposes. A publication duty is not a reuse licence. Archived, never served, until REE authorises commercial reuse in writing (research/dossiers/es.md §13 Q2).

Licence and rights evidence

Attribution
Fuente: Red Eléctrica de España (REE), capacidad de accesorequired
Technical access
Yes
Commercial use
Yes
May be cached
Yes
May be redistributed
Yes
Derived data allowed
Yes

Evidence

Methodology

1 version(s)

REE demand access-capacity study, transmission nodes

es_ree_dem_rdt_2026 · vCircular 1/2024 and its Especificaciones de Detalle (Resolution 1-12-2025, BOE-A-2025-25253)

REE's monthly study of the demand access capacity of each transmission node: nodal capacity and margin under the short-circuit, static and dynamic criteria, the reference value reserved for the underlying distribution network, the gross margin, the capacity not grantable at the transmission network (tender nodes, reference value not agreed) and the capacity available for requests under the general criterion, by demand type.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No. Do not sum these figures.
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
es_rdt_demand_access_cir1_2024

The operator’s own caveats

  • REE: the publication is informative; the specific study of each individual request always prevails.
  • Values are blank where the reference value was not agreed with the distribution operator; they are not zero.

How the publication maps to the model

availability types
["total","available","reserved","allocated","requested","unknown"]
binding
false
directions
["offtake"]
firmness
["unknown"]
geometry precision
none
includes reserved projects
null
non additive
true
notes
["One node per 'Nombre y tensión del nudo' (the same 937 nodes as the generation file), identifier es_ree_node. No coordinates; CNMC's demand layer has the nodes with geometry.","Every value is one column, its variant naming the column: per criterion the nodal capacity (total) and unoccupied margin (available), in wscr_* (short-circuit criterion, CEP demand only), estatico_* (static, demand and storage), dinamico1_margen (CEP with voltage-dip ride-through and non-CEP) and dinamico2_margen (CEP without it); valor_referencia_rdd (the reference value reserved for the underlying DSO's consumption: reserved); granted (allocated) and pending (requested) by demand type; margen_total_* (gross margin); no_otorgable_* (not grantable at the transmission network: availability unknown, with REE's reason); and the capacity available for requests under the general criterion (cep_ch, cep_sh, no_cep, storage cep / no_cep).","CEP is demand connected through power electronics; CH / SH is with / without voltage-dip ride-through ('con / sin hueco').","A blank is not zero: 313 nodes have blank margins, not-grantable and available columns because the reference value was not agreed with the DSO (REE's reason, column 54, travels in details). Those values are null and flagged not_published. CNMC's layer writes 0 for the same cells.","Numbers have no decimals; the WSCR columns write '.' as a thousands separator ('1.310' is 1,310 MW, checked against the XLSX's numeric cell)."]
spatial scope
node
technologies
["generic_load","storage_other"]
units
["MW"]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=es_ree_demand_access_capacity&limit=20" \  -H "Authorization: Bearer gc_live_..."