Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_OCUPADA
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: module scope
- MGE: all power-generating modules (MGES + MPE, generation and storage)
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_con_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_sin_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: gen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: module scope
- GEN: generation installations, storage excluded
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 1284 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 201 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to power park modules (MPE) only
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_DISPONIBLE_MPE
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_DISPONIBLE_MGES
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_margen_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_margen_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Gen_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ADMITIDA_NO_RESUELTA
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mge
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_con_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_sin_wscr
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: gen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 1284 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 709 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 201 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to power park modules (MPE) only
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: autoconsumo_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: eligibility
- self-consumption requests only (RDL 7/2026)
Injection · Generation (any) · Total
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: posicion_maximo
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Generation (any) · Total
Published in MW; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico_limitacion_interna
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic stability
- Operator note: source label
- N/A
Injection · Generation (any) · Unknown
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Generation (any) · Unknown
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: alm
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
- Operator note: scope
- gross margin, before capacity not available for requests
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ALM_DISPONIBLE_MPE
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_cnmc_gen_rdt_2026Generation access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 9 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: source field
- CAP_ALM_DISPONIBLE_MGES
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdt
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mges_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mpe_rdd
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: alm
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Injection · Other storage · Total
GrantedThe operator's latest published dataset reports 749 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Injection · Other storage · Unknown
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mges
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Injection · Other storage · Unknown
GrantedThe operator's latest published dataset reports 16 MW under methodology es_ree_gen_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_disponible_mpe
- Methodology
- es_ree_gen_rdt_2026REE generation access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Oct 2026
- Retrieved / confirmed
- 2026-10-01 07:14 UTClast confirmed unchanged 2026-10-02 05:04 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-10-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: reason not available
- Sin posibilidad de conexión. Margen zonal reservado concurso por resolución SEE/posible concurso/NTJ.
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 100 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: adicional_valor_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 100 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_wscr
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 100 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 100 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: ch_rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd_fuera_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: sh_rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: ch_aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: sh_aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 1200 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico1_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic 1: CEP demand with voltage-dip ride-through, and non-CEP demand
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 202 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to demand with a power-electronics interface (CEP) only
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: dinamico2_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- dynamic 2: CEP demand without voltage-dip ride-through
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona/Din2_Zona
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona/Din2_Zona
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Available
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Dem_Zona
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Reserved
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: valor_referencia_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: reserved for
- consumption of the underlying distribution network (reference value)
Offtake · Load (any) · Total
GrantedThe operator's latest published dataset reports 302 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: wscr_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- short-circuit power (WSCR); applies to demand with a power-electronics interface (CEP) only
Offtake · Load (any) · Total
GrantedThe operator's latest published dataset reports 127 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
- Operator note: temporary access limitation
- No
Offtake · Load (any) · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep_ch
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep_sh
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Load (any) · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: adicional_valor_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Allocated
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: aceptabilidad_rdd_fuera_referencia
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 250 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_margen
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 250 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 250 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: margen_total_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: scope
- gross margin, before capacity not grantable at the transmission network
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 250 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Other storage · Available
GrantedThe operator's latest published dataset reports 250 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: limiting criteria
- Est_Alm_Zona
- Operator note: specific regulation
- Resolución de 24 de febrero de 2026, de la Secretaría de Estado de Energía, por la que se resuelve el concurso de capacidad de acceso de demanda en determinados nudos de la red de transporte convocado mediante la Resolución de 11 de julio de 2025, de la Secretaría de Estado de Energía, por la que se convocan los concursos de capacidad de acceso de la red de transporte
- Operator note: temporary access limitation
- No
Offtake · Other storage · Requested
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: rdt
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Total
GrantedThe operator's latest published dataset reports 350 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: estatico_nodal
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: criterion
- static (N and N-X)
- Operator note: shared capacity zone
- E280_SEPE
Offtake · Other storage · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required
Offtake · Other storage · Unknown
GrantedThe operator's latest published dataset reports 0 MW under methodology es_ree_dem_rdt_2026.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: no_otorgable_no_cep
- Methodology
- es_ree_dem_rdt_2026REE demand access-capacity study, transmission nodesbasis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 1 Sep 2026
- Retrieved / confirmed
- 2026-09-26 05:58 UTClast confirmed unchanged 2026-09-30 09:22 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
Fuente: Red Eléctrica de España (REE), capacidad de acceso (last updated 2026-09-01)
- Decision context
- Not binding · indicative · a formal connection study is required