| Injection | Generation (any) | Available | 37.3 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 15.2 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 10.6 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 163.5 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 147.3 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 64.8 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 147.3 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 70.7 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 30.6 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 121.2 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 57.9 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 18.3 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 10.9 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 35.3 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 23.4 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 85.9 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 53.6 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 18.3 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 10.9 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 181.9 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 24.2 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 117.2 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 37.3 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 10.9 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 10.6 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 28.7 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 19 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 51.1 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 33.4 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 212.7 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 170.1 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 70kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 18.1 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 10.9 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 147.3 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 23.4 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 112 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 220kv | 17 Nov 2026 |