| Injection | Generation (any) | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 154.4 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 15.1 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 223.3 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 237.3 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Generation (any) | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 206.6 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 51.4 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 283.6 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Solar PV | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Injection | Onshore wind | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 100.3 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 49.2 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 10.8 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 277.6 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 16.4 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 32.1 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 102.2 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 100.3 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 18.3 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 277.6 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 60 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 60 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Offtake | Load (any) | Available | 60 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 89.7 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 49.2 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 10.8 MW | Firm, ≤ 0 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 112.5 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 110.5 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 13 MW | Flexible, ≤ 5 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 130.4 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 128.1 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 15.6 MW | Flexible, ≤ 10 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 185.9 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 182.6 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 24.3 MW | Flexible, ≤ 20 % curtailment a year | 2029 (2029)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 91.4 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 89.7 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 14.2 MW | Firm, ≤ 0 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 112.5 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 110.5 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 16.7 MW | Flexible, ≤ 5 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 130.4 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 128.1 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 18.8 MW | Flexible, ≤ 10 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 185.9 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 150kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 182.6 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 380kv | 17 Nov 2026 |
| Bidirectional | Battery | Available | 24.3 MW | Flexible, ≤ 20 % curtailment a year | 2033 (2033)variant: 36kv | 17 Nov 2026 |