| Injection | Generation (any) | Available | 23.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 5.7 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 51 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 50.5 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 97.9 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 83.7 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 182.8 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 23.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 5.7 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 54.6 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 50.5 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 123 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 97.9 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 182.8 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 30.5 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 15 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 128.3 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Solar PV | Available | 110.3 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 253.5 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Solar PV | Available | 173 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 30.5 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 15 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 128.3 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Solar PV | Available | 110.3 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 253.5 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 37.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 8.4 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 132.2 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Onshore wind | Available | 100.8 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 210.7 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 37.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 8.4 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 132.2 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Onshore wind | Available | 100.8 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 210.7 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 21.1 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 18.4 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 32.2 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 31.9 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 49.2 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 42.6 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 98.6 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 81.1 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 21.1 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 18.4 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 32.2 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 31.9 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 49.2 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 42.6 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 98.6 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 81.1 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 17 Oct 2026 |
| Offtake | Load (any) | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 18.4 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 5.7 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 32.1 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 31.8 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 48.8 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 17 Oct 2026 |
| Bidirectional | Battery | Available | 42.5 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 96.2 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 17 Oct 2026 |
| Bidirectional | Battery | Available | 80.9 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 18.4 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 5.7 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 32.1 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 31.8 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 48.8 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Bidirectional | Battery | Available | 42.5 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 96.2 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 17 Oct 2026 |
| Bidirectional | Battery | Available | 80.9 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 0 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |