Injection · Generation (any) · Allocated
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_comprometido_mva_ultimo_trimestre
Injection · Generation (any) · Allocated
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_comprometido_mva_rari
Injection · Generation (any) · Allocated
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 1.564 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_comprometido_mva_ultimo_trimestre
Injection · Generation (any) · Allocated
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 1.564 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_comprometido_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_30kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_30kv_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_15kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_15kv_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 36 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_10kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_10kv_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_at_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 36 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_at_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 129.903810568 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: hv_group
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: shared by group
- true
- Operator note: source field
- grupo_at_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_30kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_30kv_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_15kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_15kv_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 36 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_10kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_10kv_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_at_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 36 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- capacidade_de_recepcao_mt_at_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 129.903810568 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: hv_group
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: grupo de subestacoes rari
- Expo Sul, Vale Escuro, Central Tejo, Boavista (Lisboa), Santa Marta, Marvila, Arco Carvalhão
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: shared by group
- true
- Operator note: source field
- grupo_at_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_30kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_30kv_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_15kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_15kv_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 51.2 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_10kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_10kv_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_at_mva_ultimo_trimestre
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 51.2 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: mv_hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_at_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 221.6 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · variant: hv_group
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: shared by group
- true
- Operator note: source field
- grupo_at_mva_ultimo_trimestre
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_30kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_30kv_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_15kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_15kv_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 51.2 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_10kv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_10kv_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports no value (published as unknown) under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_at_mva_rari
- Operator note: source label
- -
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 51.2 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: mv_hv
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- capacidade_de_recepcao_mt_at_mva_rari
Injection · Generation (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 221.6 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI · variant: hv_group
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: grupo de subestacoes rari
- Expo Sul, Gago Coutinho, Aeroporto, Camarate, Anaia, Marvila, Expo Norte, Moscavide
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: shared by group
- true
- Operator note: source field
- grupo_at_mva_rari
Injection · Generation (any) · Connected
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_ligado_mva_ultimo_trimestre
Injection · Generation (any) · Connected
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_ligado_mva_rari
Injection · Generation (any) · Connected
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 1.2227 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_ligado_mva_ultimo_trimestre
Injection · Generation (any) · Connected
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 1.2227 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_ligado_mva_rari
Injection · Generation (any) · Requested
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_em_confirmacao_mva_ultimo_trimestre
Injection · Generation (any) · Requested
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Alto São João
- Operator note: source field
- potencia_de_ligacao_em_confirmacao_mva_rari
Injection · Generation (any) · Requested
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- Now (snapshot)
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 30 Jun 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-06-30)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2T2026
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_em_confirmacao_mva_ultimo_trimestre
Injection · Generation (any) · Requested
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 0 MVA under methodology pt_eredes_rececao_rnd.
- Firmness
- Unknown
- Horizon
- RARI
- Methodology
- pt_eredes_rececao_rndE-REDES reception capacity for generation per HV/MV substationbasis operator calculated · network state unknown · comparability class pt_eredes_rececao_rndNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 31 Dec 2025
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-02 01:19 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2025-12-31)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: horizon reference
- 2025
- Operator note: rnt busbar 60kv
- Sacavém
- Operator note: source field
- potencia_de_ligacao_em_confirmacao_mva_rari
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 2 MVA under methodology pt_eredes_carga_nao_garantida.
- Firmness
- Conditional
- Horizon
- Now (snapshot) · season: winter
- Methodology
- pt_eredes_carga_nao_garantidaE-REDES substation load headroom without N-1 securitybasis operator calculated · network state n · comparability class pt_eredes_carga_nNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_instalada_nao_garantida
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 8 MVA under methodology pt_eredes_carga_nao_garantida.
- Firmness
- Conditional
- Horizon
- Now (snapshot) · season: summer
- Methodology
- pt_eredes_carga_nao_garantidaE-REDES substation load headroom without N-1 securitybasis operator calculated · network state n · comparability class pt_eredes_carga_nNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_instalada_nao_garantida
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 29.566 MVA under methodology pt_eredes_carga_n1.
- Firmness
- Firm
- Horizon
- Now (snapshot) · season: winter
- Methodology
- pt_eredes_carga_n1E-REDES substation load headroom with N-1 securitybasis operator calculated · network state n minus 1 · comparability class pt_eredes_carga_n1Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- disponibilidade
Offtake · Load (any) · Available
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 15.476 MVA under methodology pt_eredes_carga_n1.
- Firmness
- Firm
- Horizon
- Now (snapshot) · season: summer
- Methodology
- pt_eredes_carga_n1E-REDES substation load headroom with N-1 securitybasis operator calculated · network state n minus 1 · comparability class pt_eredes_carga_n1Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- disponibilidade
Offtake · Load (any) · Installed
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 60 MVA under methodology pt_eredes_carga_potencia_instalada.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · season: winter
- Methodology
- pt_eredes_carga_potencia_instaladaE-REDES installed transformer power per substationbasis operator published · network state unknown · comparability class pt_eredes_transformer_ratingNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_instalada
Offtake · Load (any) · Installed
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 60 MVA under methodology pt_eredes_carga_potencia_instalada.
- Firmness
- Unknown
- Horizon
- Now (snapshot) · season: summer
- Methodology
- pt_eredes_carga_potencia_instaladaE-REDES installed transformer power per substationbasis operator published · network state unknown · comparability class pt_eredes_transformer_ratingNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_instalada
Offtake · Load (any) · Total
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 58 MVA under methodology pt_eredes_carga_n1.
- Firmness
- Firm
- Horizon
- Now (snapshot) · season: winter
- Methodology
- pt_eredes_carga_n1E-REDES substation load headroom with N-1 securitybasis operator calculated · network state n minus 1 · comparability class pt_eredes_carga_n1Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_garantida
Offtake · Load (any) · Total
Published in MVA; no MW figure is derived from it.
GrantedThe operator's latest published dataset reports 52 MVA under methodology pt_eredes_carga_n1.
- Firmness
- Firm
- Horizon
- Now (snapshot) · season: summer
- Methodology
- pt_eredes_carga_n1E-REDES substation load headroom with N-1 securitybasis operator calculated · network state n minus 1 · comparability class pt_eredes_carga_n1Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
- Operator’s date
- 22 Apr 2026
- Retrieved / confirmed
- 2026-09-26 02:49 UTClast confirmed unchanged 2026-10-01 18:46 UTC
- Source health
- Healthy
- Licence
- Permission by telephone, reported by the owner on 2026-10-02Attribution:
E-REDES (Distribuição de Eletricidade), "E-REDES Open Data Portal", https://e-redes.opendatasoft.com/pages/homepage/ (last updated 2026-04-22)
- Decision context
- Not binding · indicative · a formal connection study is required
- Operator note: ano
- 2025
- Operator note: source field
- potencia_garantida