Latest published values

20 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
OfftakeLoad (any)Contracted1,255 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Contracted1,355 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Contracted1,444 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Contracted1,627 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Contracted1,778 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Contracted1,751 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Contracted1,828 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Contracted1,889 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Contracted1,949 MWFirm2034 (2034)7 Sep 2026
OfftakeLoad (any)Total1,375 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Total1,375 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Total2,011 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Total2,011 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Total2,011 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Total2,161 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Total3,271 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Total3,271 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Total3,271 MWFirm2034 (2034)7 Sep 2026
OfftakeLoad (any)Waitlisted1,164 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted9FirmNow (snapshot)variant: requests7 Sep 2026

Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Offtake · Load (any) · Contracted

1,255 MW

Granted

The operator's latest published dataset reports 1255 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2026 · payload sha256 648d760a128d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,355 MW

Granted

The operator's latest published dataset reports 1355 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2027 · payload sha256 5494c44ac000…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,444 MW

Granted

The operator's latest published dataset reports 1444 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2028 · payload sha256 b63a4cbe5a07…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,627 MW

Granted

The operator's latest published dataset reports 1627 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2029 · payload sha256 3754d5a59a31…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,778 MW

Granted

The operator's latest published dataset reports 1778 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2030 · payload sha256 ef53d730b3f9…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,751 MW

Granted

The operator's latest published dataset reports 1751 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2031 · payload sha256 f419ddd3a5bc…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,828 MW

Granted

The operator's latest published dataset reports 1828 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2032 · payload sha256 88fc36c32ece…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,889 MW

Granted

The operator's latest published dataset reports 1889 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2033 · payload sha256 01501395511c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

1,949 MW

Granted

The operator's latest published dataset reports 1949 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2034 (2034)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2034 · payload sha256 62f8dfe28be5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

1,375 MW

Granted

The operator's latest published dataset reports 1375 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2026 · payload sha256 648d760a128d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

1,375 MW

Granted

The operator's latest published dataset reports 1375 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2027 · payload sha256 5494c44ac000…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

2,011 MW

Granted

The operator's latest published dataset reports 2011 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2028 · payload sha256 b63a4cbe5a07…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

2,011 MW

Granted

The operator's latest published dataset reports 2011 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2029 · payload sha256 3754d5a59a31…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

2,011 MW

Granted

The operator's latest published dataset reports 2011 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2030 · payload sha256 ef53d730b3f9…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

2,161 MW

Granted

The operator's latest published dataset reports 2161 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2031 · payload sha256 f419ddd3a5bc…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,271 MW

Granted

The operator's latest published dataset reports 3271 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2032 · payload sha256 88fc36c32ece…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,271 MW

Granted

The operator's latest published dataset reports 3271 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2033 · payload sha256 01501395511c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,271 MW

Granted

The operator's latest published dataset reports 3271 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2034 (2034)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2034 · payload sha256 62f8dfe28be5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Waitlisted

1,164 MW

Granted

The operator's latest published dataset reports 1164 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2026 · payload sha256 648d760a128d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033,2034]

Offtake · Load (any) · Waitlisted

9

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Overijssel|2026 · payload sha256 648d760a128d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033,2034]
Operator note: variant
requests

History

Served series only

Offtake · Load (any) · Total · 2026

current 1,375 MW

26 Sep 2026: 1,375 MW
26 Sep 2026range 1,375–1,375 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,375 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2026

current 1,255 MW

26 Sep 2026: 1,255 MW
26 Sep 2026range 1,255–1,255 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,255 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2027

current 1,375 MW

26 Sep 2026: 1,375 MW
26 Sep 2026range 1,375–1,375 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,375 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2027

current 1,355 MW

26 Sep 2026: 1,355 MW
26 Sep 2026range 1,355–1,355 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,355 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2028

current 2,011 MW

26 Sep 2026: 2,011 MW
26 Sep 2026range 2,011–2,011 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,011 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2028

current 1,444 MW

26 Sep 2026: 1,444 MW
26 Sep 2026range 1,444–1,444 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,444 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2029

current 2,011 MW

26 Sep 2026: 2,011 MW
26 Sep 2026range 2,011–2,011 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,011 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2029

current 1,627 MW

26 Sep 2026: 1,627 MW
26 Sep 2026range 1,627–1,627 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,627 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2030

current 2,011 MW

26 Sep 2026: 2,011 MW
26 Sep 2026range 2,011–2,011 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,011 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2030

current 1,778 MW

26 Sep 2026: 1,778 MW
26 Sep 2026range 1,778–1,778 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,778 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2031

current 2,161 MW

26 Sep 2026: 2,161 MW
26 Sep 2026range 2,161–2,161 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,161 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2031

current 1,751 MW

26 Sep 2026: 1,751 MW
26 Sep 2026range 1,751–1,751 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,751 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 20 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq7fvdnvqx1ywfrdha2hyd8/capacity" \  -H "Authorization: Bearer gc_live_..."
Overijssel congestion zone: grid capacity (TenneT TSO B.V.) · GridCapacity API