Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion area
nl_nbnl_tennet_gebieden_v2 · vbrondata_documentatie.txt v2.0 (2024-11-20)TenneT states, per congestion area on its HV grid and per target year, the maximum transport capacity the network can carry (total) and the transport capacity needed at peak for all existing transport agreements (contracted), and the queue of its own HV-connected customers (waitlisted, MW and unique requests). Same definitions as the DSO layer, a different grid level and a different operator's calculation.
- Capacity basis
- operator published
- Network state
- unknown
- Binding
- No
- Additive across assets
- No — do not sum these figures
- The method accounts for
- reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
- Comparability class
- nl_capaciteitskaart_tennet_hv
- Documentation
- —
The operator’s own caveats
- Indicative; no rights can be derived from it.
- Figures refer to TenneT's HV level only; never add them to a DSO area's figures.
- The end date of congestion can differ for parts of an area from the expected moment of the last required grid expansion (the operator's own info note, in details).