Latest published values

20 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
OfftakeLoad (any)Contracted2,178 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Contracted2,418 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Contracted2,627 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Contracted2,743 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Contracted2,866 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Contracted2,986 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Contracted2,945 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Contracted3,061 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Contracted3,195 MWFirm2034 (2034)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Total2,319 MWFirm2034 (2034)7 Sep 2026
OfftakeLoad (any)Waitlisted910 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted7FirmNow (snapshot)variant: requests7 Sep 2026

Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Offtake · Load (any) · Contracted

2,178 MW

Granted

The operator's latest published dataset reports 2178 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2026 · payload sha256 6b663ed22983…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,418 MW

Granted

The operator's latest published dataset reports 2418 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2027 · payload sha256 2b71d3c031af…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,627 MW

Granted

The operator's latest published dataset reports 2627 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2028 · payload sha256 719b3b52530b…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,743 MW

Granted

The operator's latest published dataset reports 2743 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2029 · payload sha256 96ec5f59a907…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,866 MW

Granted

The operator's latest published dataset reports 2866 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2030 · payload sha256 c66d60ed6b5d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,986 MW

Granted

The operator's latest published dataset reports 2986 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2031 · payload sha256 f22215f29585…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

2,945 MW

Granted

The operator's latest published dataset reports 2945 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2032 · payload sha256 16e1c0155db2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

3,061 MW

Granted

The operator's latest published dataset reports 3061 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2033 · payload sha256 90013daab25a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Contracted

3,195 MW

Granted

The operator's latest published dataset reports 3195 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2034 (2034)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2034 · payload sha256 49a54f2dc732…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2026 · payload sha256 6b663ed22983…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2027 · payload sha256 2b71d3c031af…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2028 · payload sha256 719b3b52530b…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2029 · payload sha256 96ec5f59a907…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2030 · payload sha256 c66d60ed6b5d…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2031 · payload sha256 f22215f29585…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2032 · payload sha256 16e1c0155db2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2033 · payload sha256 90013daab25a…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Total

2,319 MW

Granted

The operator's latest published dataset reports 2319 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2034 (2034)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2034 · payload sha256 49a54f2dc732…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034

Offtake · Load (any) · Waitlisted

910 MW

Granted

The operator's latest published dataset reports 910 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2026 · payload sha256 6b663ed22983…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033,2034]

Offtake · Load (any) · Waitlisted

7

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 7 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Noordelijk Zuid-Holland|2026 · payload sha256 6b663ed22983…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: jaartal opgelost
2034
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033,2034]
Operator note: variant
requests

History

Served series only

Offtake · Load (any) · Total · 2026

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2026

current 2,178 MW

26 Sep 2026: 2,178 MW
26 Sep 2026range 2,178–2,178 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,178 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2027

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2027

current 2,418 MW

26 Sep 2026: 2,418 MW
26 Sep 2026range 2,418–2,418 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,418 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2028

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2028

current 2,627 MW

26 Sep 2026: 2,627 MW
26 Sep 2026range 2,627–2,627 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,627 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2029

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2029

current 2,743 MW

26 Sep 2026: 2,743 MW
26 Sep 2026range 2,743–2,743 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,743 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2030

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2030

current 2,866 MW

26 Sep 2026: 2,866 MW
26 Sep 2026range 2,866–2,866 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,866 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2031

current 2,319 MW

26 Sep 2026: 2,319 MW
26 Sep 2026range 2,319–2,319 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,319 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2031

current 2,986 MW

26 Sep 2026: 2,986 MW
26 Sep 2026range 2,986–2,986 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,986 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 20 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq7fvddr6x933rdmj5mne1w/capacity" \  -H "Authorization: Bearer gc_live_..."
Noordelijk Zuid-Holland congestion zone: grid capacity (TenneT TSO B.V.) · GridCapacity API