Latest published values

14 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
OfftakeLoad (any)Contracted723 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Contracted785 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Contracted816 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Contracted855 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Contracted855 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Contracted919 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Total716 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Total777 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Total777 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Total777 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Total777 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Total1,694 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Waitlisted1,301 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted11FirmNow (snapshot)variant: requests7 Sep 2026

Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Offtake · Load (any) · Contracted

723 MW

Granted

The operator's latest published dataset reports 723 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2026 · payload sha256 737342c12616…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Contracted

785 MW

Granted

The operator's latest published dataset reports 785 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2027 · payload sha256 c56f399e2096…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Contracted

816 MW

Granted

The operator's latest published dataset reports 816 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2028 · payload sha256 f7df623d56a1…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Contracted

855 MW

Granted

The operator's latest published dataset reports 855 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2029 · payload sha256 a7eb10a70fd7…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Contracted

855 MW

Granted

The operator's latest published dataset reports 855 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2030 · payload sha256 d44d7da73246…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Contracted

919 MW

Granted

The operator's latest published dataset reports 919 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2031 · payload sha256 d326a3804a44…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

716 MW

Granted

The operator's latest published dataset reports 716 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2026 · payload sha256 737342c12616…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

777 MW

Granted

The operator's latest published dataset reports 777 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2027 · payload sha256 c56f399e2096…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

777 MW

Granted

The operator's latest published dataset reports 777 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2028 · payload sha256 f7df623d56a1…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

777 MW

Granted

The operator's latest published dataset reports 777 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2029 · payload sha256 a7eb10a70fd7…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

777 MW

Granted

The operator's latest published dataset reports 777 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2030 · payload sha256 d44d7da73246…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Total

1,694 MW

Granted

The operator's latest published dataset reports 1694 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2031 · payload sha256 d326a3804a44…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032

Offtake · Load (any) · Waitlisted

1,301 MW

Granted

The operator's latest published dataset reports 1301 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2026 · payload sha256 737342c12616…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032
Operator note: jaren
[2026,2027,2028,2029,2030,2031]

Offtake · Load (any) · Waitlisted

11

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 11 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Haven van Rotterdam|2026 · payload sha256 737342c12616…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2032
Operator note: jaren
[2026,2027,2028,2029,2030,2031]
Operator note: variant
requests

History

Served series only

Offtake · Load (any) · Total · 2026

current 716 MW

26 Sep 2026: 716 MW
26 Sep 2026range 716–716 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current716 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2026

current 723 MW

26 Sep 2026: 723 MW
26 Sep 2026range 723–723 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current723 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2027

current 777 MW

26 Sep 2026: 777 MW
26 Sep 2026range 777–777 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current777 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2027

current 785 MW

26 Sep 2026: 785 MW
26 Sep 2026range 785–785 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current785 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2028

current 777 MW

26 Sep 2026: 777 MW
26 Sep 2026range 777–777 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current777 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2028

current 816 MW

26 Sep 2026: 816 MW
26 Sep 2026range 816–816 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current816 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2029

current 777 MW

26 Sep 2026: 777 MW
26 Sep 2026range 777–777 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current777 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2029

current 855 MW

26 Sep 2026: 855 MW
26 Sep 2026range 855–855 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current855 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2030

current 777 MW

26 Sep 2026: 777 MW
26 Sep 2026range 777–777 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current777 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2030

current 855 MW

26 Sep 2026: 855 MW
26 Sep 2026range 855–855 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current855 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2031

current 1,694 MW

26 Sep 2026: 1,694 MW
26 Sep 2026range 1,694–1,694 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,694 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2031

current 919 MW

26 Sep 2026: 919 MW
26 Sep 2026range 919–919 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current919 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 14 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq7fvcxs4b3195f98mpj35m/capacity" \  -H "Authorization: Bearer gc_live_..."
Haven van Rotterdam congestion zone: grid capacity (TenneT TSO B.V.) · GridCapacity API