Congestion zone · hv

Flevopolder, Utrecht en Gelderland

TenneT TSO B.V. · Netherlands

Latest published values

36 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Contracted3,327 MWFirm2026 (2026)7 Sep 2026
InjectionGeneration (any)Contracted3,576 MWFirm2027 (2027)7 Sep 2026
InjectionGeneration (any)Contracted3,844 MWFirm2028 (2028)7 Sep 2026
InjectionGeneration (any)Contracted4,062 MWFirm2029 (2029)7 Sep 2026
InjectionGeneration (any)Contracted4,257 MWFirm2030 (2030)7 Sep 2026
InjectionGeneration (any)Contracted4,404 MWFirm2031 (2031)7 Sep 2026
InjectionGeneration (any)Contracted4,539 MWFirm2032 (2032)7 Sep 2026
InjectionGeneration (any)Contracted4,654 MWFirm2033 (2033)7 Sep 2026
InjectionGeneration (any)Total2,613 MWFirm2026 (2026)7 Sep 2026
InjectionGeneration (any)Total2,613 MWFirm2027 (2027)7 Sep 2026
InjectionGeneration (any)Total2,613 MWFirm2028 (2028)7 Sep 2026
InjectionGeneration (any)Total2,613 MWFirm2029 (2029)7 Sep 2026
InjectionGeneration (any)Total2,735 MWFirm2030 (2030)7 Sep 2026
InjectionGeneration (any)Total2,976 MWFirm2031 (2031)7 Sep 2026
InjectionGeneration (any)Total2,976 MWFirm2032 (2032)7 Sep 2026
InjectionGeneration (any)Total2,976 MWFirm2033 (2033)7 Sep 2026
InjectionGeneration (any)Waitlisted1,538 MWFirmNow (snapshot)7 Sep 2026
InjectionGeneration (any)Waitlisted9FirmNow (snapshot)variant: requests7 Sep 2026
OfftakeLoad (any)Contracted3,420 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Contracted3,608 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Contracted3,743 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Contracted3,877 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Contracted4,008 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Contracted4,179 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Contracted4,362 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Contracted4,549 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Total3,000 MWFirm2026 (2026)7 Sep 2026
OfftakeLoad (any)Total3,000 MWFirm2027 (2027)7 Sep 2026
OfftakeLoad (any)Total3,000 MWFirm2028 (2028)7 Sep 2026
OfftakeLoad (any)Total3,000 MWFirm2029 (2029)7 Sep 2026
OfftakeLoad (any)Total3,120 MWFirm2030 (2030)7 Sep 2026
OfftakeLoad (any)Total3,180 MWFirm2031 (2031)7 Sep 2026
OfftakeLoad (any)Total3,180 MWFirm2032 (2032)7 Sep 2026
OfftakeLoad (any)Total3,180 MWFirm2033 (2033)7 Sep 2026
OfftakeLoad (any)Waitlisted1,339 MWFirmNow (snapshot)7 Sep 2026
OfftakeLoad (any)Waitlisted9FirmNow (snapshot)variant: requests7 Sep 2026

Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Contracted

3,327 MW

Granted

The operator's latest published dataset reports 3327 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

3,576 MW

Granted

The operator's latest published dataset reports 3576 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2027 · payload sha256 00e45f86f8c8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

3,844 MW

Granted

The operator's latest published dataset reports 3844 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2028 · payload sha256 d69169362c61…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

4,062 MW

Granted

The operator's latest published dataset reports 4062 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2029 · payload sha256 3593795ce57c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

4,257 MW

Granted

The operator's latest published dataset reports 4257 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2030 · payload sha256 c0a48f279fd8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

4,404 MW

Granted

The operator's latest published dataset reports 4404 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2031 · payload sha256 dbf4081b6c89…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

4,539 MW

Granted

The operator's latest published dataset reports 4539 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2032 · payload sha256 8ed6f2a367e5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Contracted

4,654 MW

Granted

The operator's latest published dataset reports 4654 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2033 · payload sha256 d04e0dbcc0d2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,613 MW

Granted

The operator's latest published dataset reports 2613 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,613 MW

Granted

The operator's latest published dataset reports 2613 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2027 · payload sha256 00e45f86f8c8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,613 MW

Granted

The operator's latest published dataset reports 2613 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2028 · payload sha256 d69169362c61…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,613 MW

Granted

The operator's latest published dataset reports 2613 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2029 · payload sha256 3593795ce57c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,735 MW

Granted

The operator's latest published dataset reports 2735 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2030 · payload sha256 c0a48f279fd8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,976 MW

Granted

The operator's latest published dataset reports 2976 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2031 · payload sha256 dbf4081b6c89…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,976 MW

Granted

The operator's latest published dataset reports 2976 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2032 · payload sha256 8ed6f2a367e5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Total

2,976 MW

Granted

The operator's latest published dataset reports 2976 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2033 · payload sha256 d04e0dbcc0d2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Injection · Generation (any) · Waitlisted

1,538 MW

Granted

The operator's latest published dataset reports 1538 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033]

Injection · Generation (any) · Waitlisted

9

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033]
Operator note: variant
requests

Offtake · Load (any) · Contracted

3,420 MW

Granted

The operator's latest published dataset reports 3420 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

3,608 MW

Granted

The operator's latest published dataset reports 3608 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2027 · payload sha256 00e45f86f8c8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

3,743 MW

Granted

The operator's latest published dataset reports 3743 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2028 · payload sha256 d69169362c61…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

3,877 MW

Granted

The operator's latest published dataset reports 3877 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2029 · payload sha256 3593795ce57c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

4,008 MW

Granted

The operator's latest published dataset reports 4008 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2030 · payload sha256 c0a48f279fd8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

4,179 MW

Granted

The operator's latest published dataset reports 4179 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2031 · payload sha256 dbf4081b6c89…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

4,362 MW

Granted

The operator's latest published dataset reports 4362 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2032 · payload sha256 8ed6f2a367e5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Contracted

4,549 MW

Granted

The operator's latest published dataset reports 4549 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2033 · payload sha256 d04e0dbcc0d2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,000 MW

Granted

The operator's latest published dataset reports 3000 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,000 MW

Granted

The operator's latest published dataset reports 3000 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2027 · payload sha256 00e45f86f8c8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,000 MW

Granted

The operator's latest published dataset reports 3000 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2028 · payload sha256 d69169362c61…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,000 MW

Granted

The operator's latest published dataset reports 3000 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2029 · payload sha256 3593795ce57c…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,120 MW

Granted

The operator's latest published dataset reports 3120 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2030 · payload sha256 c0a48f279fd8…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,180 MW

Granted

The operator's latest published dataset reports 3180 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2031 (2031)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2031 · payload sha256 dbf4081b6c89…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,180 MW

Granted

The operator's latest published dataset reports 3180 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2032 (2032)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2032 · payload sha256 8ed6f2a367e5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Total

3,180 MW

Granted

The operator's latest published dataset reports 3180 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2033 (2033)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2033 · payload sha256 d04e0dbcc0d2…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035

Offtake · Load (any) · Waitlisted

1,339 MW

Granted

The operator's latest published dataset reports 1339 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033]

Offtake · Load (any) · Waitlisted

9

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Flevopolder, Utrecht en Gelderland|2026 · payload sha256 74a84a1142f5…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2035
Operator note: jaren
[2026,2027,2028,2029,2030,2031,2032,2033]
Operator note: variant
requests

History

Served series only

Offtake · Load (any) · Total · 2026

current 3,000 MW

26 Sep 2026: 3,000 MW
26 Sep 2026range 3,000–3,000 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,000 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2026

current 3,420 MW

26 Sep 2026: 3,420 MW
26 Sep 2026range 3,420–3,420 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,420 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2027

current 3,000 MW

26 Sep 2026: 3,000 MW
26 Sep 2026range 3,000–3,000 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,000 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2027

current 3,608 MW

26 Sep 2026: 3,608 MW
26 Sep 2026range 3,608–3,608 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,608 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2028

current 3,000 MW

26 Sep 2026: 3,000 MW
26 Sep 2026range 3,000–3,000 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,000 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2028

current 3,743 MW

26 Sep 2026: 3,743 MW
26 Sep 2026range 3,743–3,743 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,743 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2029

current 3,000 MW

26 Sep 2026: 3,000 MW
26 Sep 2026range 3,000–3,000 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,000 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2029

current 3,877 MW

26 Sep 2026: 3,877 MW
26 Sep 2026range 3,877–3,877 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,877 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2030

current 3,120 MW

26 Sep 2026: 3,120 MW
26 Sep 2026range 3,120–3,120 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,120 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2030

current 4,008 MW

26 Sep 2026: 4,008 MW
26 Sep 2026range 4,008–4,008 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4,008 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Total · 2031

current 3,180 MW

26 Sep 2026: 3,180 MW
26 Sep 2026range 3,180–3,180 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,180 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Contracted · 2031

current 4,179 MW

26 Sep 2026: 4,179 MW
26 Sep 2026range 4,179–4,179 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4,179 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 36 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq7fvcht6h2t868c18tjvqg/capacity" \  -H "Authorization: Bearer gc_live_..."
Flevopolder, Utrecht en Gelderland congestion zone: grid capacity (TenneT TSO B.V.) · GridCapacity API