Latest published values

12 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Contracted778 MWFirm2026 (2026)7 Sep 2026
InjectionGeneration (any)Contracted782 MWFirm2027 (2027)7 Sep 2026
InjectionGeneration (any)Contracted687 MWFirm2028 (2028)7 Sep 2026
InjectionGeneration (any)Contracted693 MWFirm2029 (2029)7 Sep 2026
InjectionGeneration (any)Contracted712 MWFirm2030 (2030)7 Sep 2026
InjectionGeneration (any)Total509 MWFirm2026 (2026)7 Sep 2026
InjectionGeneration (any)Total361 MWFirm2027 (2027)7 Sep 2026
InjectionGeneration (any)Total361 MWFirm2028 (2028)7 Sep 2026
InjectionGeneration (any)Total361 MWFirm2029 (2029)7 Sep 2026
InjectionGeneration (any)Total1,025 MWFirm2030 (2030)7 Sep 2026
InjectionGeneration (any)Waitlisted1,304 MWFirmNow (snapshot)7 Sep 2026
InjectionGeneration (any)Waitlisted7FirmNow (snapshot)variant: requests7 Sep 2026

Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Contracted

778 MW

Granted

The operator's latest published dataset reports 778 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2026 · payload sha256 1e170f981bd0…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Contracted

782 MW

Granted

The operator's latest published dataset reports 782 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2027 · payload sha256 237723e2f624…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Contracted

687 MW

Granted

The operator's latest published dataset reports 687 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2028 · payload sha256 570e11850471…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Contracted

693 MW

Granted

The operator's latest published dataset reports 693 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2029 · payload sha256 a0f415041039…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Contracted

712 MW

Granted

The operator's latest published dataset reports 712 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2030 · payload sha256 4146997c052b…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Total

509 MW

Granted

The operator's latest published dataset reports 509 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2026 (2026)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2026 · payload sha256 1e170f981bd0…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Total

361 MW

Granted

The operator's latest published dataset reports 361 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2027 (2027)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2027 · payload sha256 237723e2f624…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Total

361 MW

Granted

The operator's latest published dataset reports 361 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2028 (2028)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2028 · payload sha256 570e11850471…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Total

361 MW

Granted

The operator's latest published dataset reports 361 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2029 (2029)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2029 · payload sha256 a0f415041039…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Total

1,025 MW

Granted

The operator's latest published dataset reports 1025 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
2030 (2030)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2030 · payload sha256 4146997c052b…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034

Injection · Generation (any) · Waitlisted

1,304 MW

Granted

The operator's latest published dataset reports 1304 MW under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2026 · payload sha256 1e170f981bd0…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034
Operator note: jaren
[2026,2027,2028,2029,2030]

Injection · Generation (any) · Waitlisted

7

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 7 count under methodology nl_nbnl_tennet_gebieden_v2.

Firmness
Firm
Horizon
Now (snapshot) · variant: requests
Methodology
nl_nbnl_tennet_gebieden_v2Capaciteitskaart: TenneT HV transport capacity, contracted peak need and queue per congestion areabasis operator published · network state unknown · comparability class nl_capaciteitskaart_tennet_hvNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: no
Operator’s date
7 Sep 2026
Retrieved / confirmed
2026-09-26 02:49 UTClast confirmed unchanged 2026-09-29 03:51 UTC
Source health
Healthy
Provenance
nl_nbnl_tennet_gebiedenrecord Drenthe|2026 · payload sha256 1e170f981bd0…Operator’s publication (opens the operator’s site)
Licence
Energie Dataportaal, Algemene gebruiksvoorwaarden (Open omgeving), as confirmed for the TenneT layer by Netbeheer Nederland's Centraal DataloketAttribution: Bron: Netbeheer Nederland, landelijke capaciteitskaart. Indicatieve gegevens, geen formele bevestiging van beschikbare transportcapaciteit (last updated 2026-09-07)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: info
Congestie einddatum kan voor sommige delen in een voedingsgebied afwijken van verwacht moment van laatst benodigde netuitbreiding
Operator note: jaartal opgelost
2034
Operator note: jaren
[2026,2027,2028,2029,2030]
Operator note: variant
requests

History

Served series only

Injection · Generation (any) · Total · 2026

current 509 MW

26 Sep 2026: 509 MW
26 Sep 2026range 509–509 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current509 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted · 2026

current 778 MW

26 Sep 2026: 778 MW
26 Sep 2026range 778–778 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current778 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total · 2027

current 361 MW

26 Sep 2026: 361 MW
26 Sep 2026range 361–361 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current361 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted · 2027

current 782 MW

26 Sep 2026: 782 MW
26 Sep 2026range 782–782 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current782 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total · 2028

current 361 MW

26 Sep 2026: 361 MW
26 Sep 2026range 361–361 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current361 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted · 2028

current 687 MW

26 Sep 2026: 687 MW
26 Sep 2026range 687–687 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current687 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total · 2029

current 361 MW

26 Sep 2026: 361 MW
26 Sep 2026range 361–361 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current361 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted · 2029

current 693 MW

26 Sep 2026: 693 MW
26 Sep 2026range 693–693 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current693 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total · 2030

current 1,025 MW

26 Sep 2026: 1,025 MW
26 Sep 2026range 1,025–1,025 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,025 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted · 2030

current 712 MW

26 Sep 2026: 712 MW
26 Sep 2026range 712–712 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current712 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Waitlisted

current 1,304 MW

26 Sep 2026: 1,304 MW
26 Sep 2026range 1,304–1,304 MW29 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,304 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Waitlisted

current 7

26 Sep 2026: 7
26 Sep 2026range 7–729 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current7

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/zone_06gdq7fvc9rxq654dybq23xdkg/capacity" \  -H "Authorization: Bearer gc_live_..."
Drenthe congestion zone: grid capacity (TenneT TSO B.V.) · GridCapacity API