Skip to content

Substation / 33 kV / bsp

ORRELL

SP Electricity North West / United Kingdom

Latest published values

5 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available135.787749 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available53.351327 MWConditionalNow (snapshot)variant: synchronous14 Aug 2026
OfftakeLoad (any)Available60.31645 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available3.31645 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable60.31645 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

135.787749 MW

Granted

The operator's latest published dataset reports 135.787749087 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:ORRELL · payload sha256 0b6ab9c7a701…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

53.351327 MW

Granted

The operator's latest published dataset reports 53.351327434 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:ORRELL · payload sha256 0b6ab9c7a701…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Synchronous

Offtake · Load (any) · Available

60.31645 MW

Granted

The operator's latest published dataset reports 60.316449634 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:ORRELL · payload sha256 0b6ab9c7a701…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Non Firm

Offtake · Load (any) · Available

3.31645 MW

Granted

The operator's latest published dataset reports 3.316449634 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:ORRELL · payload sha256 0b6ab9c7a701…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

60.31645 MW

Granted

The operator's latest published dataset reports 60.316449634 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:ORRELL · payload sha256 0b6ab9c7a701…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 3.31645 MW

26 Sep 2026: 3.31645 MW
26 Sep 2026range 3.31645 to 3.31645 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3.31645 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 60.31645 MW

26 Sep 2026: 60.31645 MW
26 Sep 2026range 60.31645 to 60.31645 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current60.31645 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 135.787749 MW

26 Sep 2026: 135.787749 MW
26 Sep 2026range 135.787749 to 135.787749 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current135.787749 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 53.351327 MW

26 Sep 2026: 53.351327 MW
26 Sep 2026range 53.351327 to 53.351327 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.351327 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 60.31645 MW

26 Sep 2026: 60.31645 MW
26 Sep 2026range 60.31645 to 60.31645 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current60.31645 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j4w8xyykw0/capacity" \  -H "Authorization: Bearer gc_live_..."
ORRELL 33 kV substation: grid capacity (SP Electricity North West) · GridCapacity API