Skip to content

Substation / 11 kV / primary

NEWTONGATE T13

SP Electricity North West / United Kingdom

Latest published values

6 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available19.733512 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available19.733512 MWConditionalNow (snapshot)variant: synchronous_lv14 Aug 2026
InjectionGeneration (any)Available19.3355 MWConditionalNow (snapshot)variant: synchronous_hv14 Aug 2026
OfftakeLoad (any)Available5.645774 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available0.895774 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable5.645774 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

19.733512 MW

Granted

The operator's latest published dataset reports 19.733511739 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

19.733512 MW

Granted

The operator's latest published dataset reports 19.733511739 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_lv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - LV

Injection · Generation (any) · Available

19.3355 MW

Granted

The operator's latest published dataset reports 19.335499515 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_hv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - HV

Offtake · Load (any) · Available

5.645774 MW

Granted

The operator's latest published dataset reports 5.645773828 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / N-0

Offtake · Load (any) · Available

0.895774 MW

Granted

The operator's latest published dataset reports 0.895773828 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

5.645774 MW

Granted

The operator's latest published dataset reports 5.645773828 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T13 · payload sha256 41ff14d1aba7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 0.895774 MW

26 Sep 2026: 0.895774 MW
26 Sep 2026range 0.895774 to 0.895774 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.895774 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 5.645774 MW

26 Sep 2026: 5.645774 MW
26 Sep 2026range 5.645774 to 5.645774 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.645774 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 19.733512 MW

26 Sep 2026: 19.733512 MW
26 Sep 2026range 19.733512 to 19.733512 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current19.733512 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 19.733512 MW

26 Sep 2026: 19.733512 MW
26 Sep 2026range 19.733512 to 19.733512 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current19.733512 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 19.3355 MW

26 Sep 2026: 19.3355 MW
26 Sep 2026range 19.3355 to 19.3355 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current19.3355 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 5.645774 MW

26 Sep 2026: 5.645774 MW
26 Sep 2026range 5.645774 to 5.645774 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.645774 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnjdszf095gb0rr01v20/capacity" \  -H "Authorization: Bearer gc_live_..."
NEWTONGATE T13 11 kV substation: grid capacity (SP Electricity North West) · GridCapacity API