Skip to content

Substation / 11 kV / primary

NEWTONGATE T11 & T12

SP Electricity North West / United Kingdom

Latest published values

6 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available26.807436 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available6.433603 MWConditionalNow (snapshot)variant: synchronous_lv14 Aug 2026
InjectionGeneration (any)Available4.623957 MWConditionalNow (snapshot)variant: synchronous_hv14 Aug 2026
OfftakeLoad (any)Available5.224059 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available1.224059 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable5.224059 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

26.807436 MW

Granted

The operator's latest published dataset reports 26.807435538 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

6.433603 MW

Granted

The operator's latest published dataset reports 6.433603239 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_lv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - LV

Injection · Generation (any) · Available

4.623957 MW

Granted

The operator's latest published dataset reports 4.623957323 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_hv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - HV

Offtake · Load (any) · Available

5.224059 MW

Granted

The operator's latest published dataset reports 5.224059306 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / N-0

Offtake · Load (any) · Available

1.224059 MW

Granted

The operator's latest published dataset reports 1.224059306 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

5.224059 MW

Granted

The operator's latest published dataset reports 5.224059306 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:NEWTONGATE T11 & T12 · payload sha256 21f0aee6c0e1…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 1.224059 MW

26 Sep 2026: 1.224059 MW
26 Sep 2026range 1.224059 to 1.224059 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1.224059 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 5.224059 MW

26 Sep 2026: 5.224059 MW
26 Sep 2026range 5.224059 to 5.224059 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.224059 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 26.807436 MW

26 Sep 2026: 26.807436 MW
26 Sep 2026range 26.807436 to 26.807436 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current26.807436 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 6.433603 MW

26 Sep 2026: 6.433603 MW
26 Sep 2026range 6.433603 to 6.433603 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6.433603 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 4.623957 MW

26 Sep 2026: 4.623957 MW
26 Sep 2026range 4.623957 to 4.623957 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.623957 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 5.224059 MW

26 Sep 2026: 5.224059 MW
26 Sep 2026range 5.224059 to 5.224059 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.224059 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnjdszf095gb0dgt6en4/capacity" \  -H "Authorization: Bearer gc_live_..."