Substation / gsp

KEARSLEY

SP Electricity North West / United Kingdom

Latest published values

7 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available0 MWUnknownNow (snapshot)variant: appendix_g_part_514 Aug 2026
InjectionGeneration (any)Connected57.9 MWUnknownNow (snapshot)variant: appendix_g_part_114 Aug 2026
InjectionGeneration (any)Contracted35 MWUnknownNow (snapshot)variant: appendix_g_part_414 Aug 2026
InjectionGeneration (any)Requested0 MWUnknownNow (snapshot)variant: project_progression14 Aug 2026
InjectionGeneration (any)Total333.6 MWUnknownNow (snapshot)variant: appendix_g_total14 Aug 2026
InjectionGeneration (any)Unknown229.7 MWUnknownNow (snapshot)variant: appendix_g_part_214 Aug 2026
InjectionGeneration (any)Unknown11 MWUnknownNow (snapshot)variant: appendix_g_part_314 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_part_5
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Materiality Headroom (Part 5) (MW)

Injection · Generation (any) · Connected

57.9 MW

Granted

The operator's latest published dataset reports 57.9 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_part_1
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Capacity of Connected & Contracted Connections (MW) / Part 1

Injection · Generation (any) · Contracted

35 MW

Granted

The operator's latest published dataset reports 35 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_part_4
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Capacity of Connected & Contracted Connections (MW) / Part 4

Injection · Generation (any) · Requested

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: project_progression
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Capacity in Project Progression / Modification Application

Injection · Generation (any) · Total

333.6 MW

Granted

The operator's latest published dataset reports 333.6 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_total
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Total Aggregated Developer Capacity Limit(MW)

Injection · Generation (any) · Unknown

229.7 MW

Granted

The operator's latest published dataset reports 229.7 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_part_2
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Capacity of Connected & Contracted Connections (MW) / Part 2

Injection · Generation (any) · Unknown

11 MW

Granted

The operator's latest published dataset reports 11 MW under methodology gb_enwl_heatmap_tool_appendix_g_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: appendix_g_part_3
Methodology
gb_enwl_heatmap_tool_appendix_g_2026ENWL Heatmap Tool: Appendix G summarybasis operator published · network state unknown · comparability class gb_enwl_appendix_gNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord gsp:KEARSLEY · payload sha256 b439dbce0a03…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: materiality status
C
Operator note: source field
Capacity of Connected & Contracted Connections (MW) / Part 3

History

Served series only

Injection · Generation (any) · Connected

current 57.9 MW

26 Sep 2026: 57.9 MW
26 Sep 2026range 57.9 to 57.9 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current57.9 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Unknown

current 229.7 MW

26 Sep 2026: 229.7 MW
26 Sep 2026range 229.7 to 229.7 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current229.7 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Unknown

current 11 MW

26 Sep 2026: 11 MW
26 Sep 2026range 11 to 11 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current11 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Contracted

current 35 MW

26 Sep 2026: 35 MW
26 Sep 2026range 35 to 35 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current35 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Total

current 333.6 MW

26 Sep 2026: 333.6 MW
26 Sep 2026range 333.6 to 333.6 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current333.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j42m2zmqj4/capacity" \  -H "Authorization: Bearer gc_live_..."
KEARSLEY substation: grid capacity (SP Electricity North West) · GridCapacity API