Substation / 6.6 kV / primary

HOLLINWOOD

SP Electricity North West / United Kingdom

Latest published values

6 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available27.100564 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available7.352772 MWConditionalNow (snapshot)variant: synchronous_lv14 Aug 2026
InjectionGeneration (any)Available5.364785 MWConditionalNow (snapshot)variant: synchronous_hv14 Aug 2026
OfftakeLoad (any)Available4.248929 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available4.248929 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable4.248929 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

27.100564 MW

Granted

The operator's latest published dataset reports 27.100563838 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

7.352772 MW

Granted

The operator's latest published dataset reports 7.352772238 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_lv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - LV

Injection · Generation (any) · Available

5.364785 MW

Granted

The operator's latest published dataset reports 5.364784633 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous_hv
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom N-0 -(MW) / Synchronous - HV

Offtake · Load (any) · Available

4.248929 MW

Granted

The operator's latest published dataset reports 4.248929261 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / N-0

Offtake · Load (any) · Available

4.248929 MW

Granted

The operator's latest published dataset reports 4.248929261 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

4.248929 MW

Granted

The operator's latest published dataset reports 4.248929261 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord primary:HOLLINWOOD · payload sha256 3b55bc8cd4a7…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 4.248929 MW

26 Sep 2026: 4.248929 MW
26 Sep 2026range 4.248929 to 4.248929 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.248929 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 4.248929 MW

26 Sep 2026: 4.248929 MW
26 Sep 2026range 4.248929 to 4.248929 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.248929 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 27.100564 MW

26 Sep 2026: 27.100564 MW
26 Sep 2026range 27.100564 to 27.100564 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current27.100564 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 7.352772 MW

26 Sep 2026: 7.352772 MW
26 Sep 2026range 7.352772 to 7.352772 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current7.352772 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 5.364785 MW

26 Sep 2026: 5.364785 MW
26 Sep 2026range 5.364785 to 5.364785 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5.364785 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 4.248929 MW

26 Sep 2026: 4.248929 MW
26 Sep 2026range 4.248929 to 4.248929 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.248929 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j7wze7t7r4/capacity" \  -H "Authorization: Bearer gc_live_..."
HOLLINWOOD 6.6 kV substation: grid capacity (SP Electricity North West) · GridCapacity API