EGREMONT

SP Electricity North West / United Kingdom

Latest published values

5 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available10.141463 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available1.839823 MWConditionalNow (snapshot)variant: synchronous14 Aug 2026
OfftakeLoad (any)Available50.531728 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available50.531728 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable10.141463 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

10.141463 MW

Granted

The operator's latest published dataset reports 10.141463415 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:EGREMONT · payload sha256 5d3fd5dfb811…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

1.839823 MW

Granted

The operator's latest published dataset reports 1.839823009 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:EGREMONT · payload sha256 5d3fd5dfb811…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Synchronous

Offtake · Load (any) · Available

50.531728 MW

Granted

The operator's latest published dataset reports 50.53172816 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:EGREMONT · payload sha256 5d3fd5dfb811…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Non Firm

Offtake · Load (any) · Available

50.531728 MW

Granted

The operator's latest published dataset reports 50.53172816 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:EGREMONT · payload sha256 5d3fd5dfb811…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

10.141463 MW

Granted

The operator's latest published dataset reports 10.141463415 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:EGREMONT · payload sha256 5d3fd5dfb811…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 50.531728 MW

26 Sep 2026: 50.531728 MW
26 Sep 2026range 50.531728 to 50.531728 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current50.531728 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 50.531728 MW

26 Sep 2026: 50.531728 MW
26 Sep 2026range 50.531728 to 50.531728 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current50.531728 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 10.141463 MW

26 Sep 2026: 10.141463 MW
26 Sep 2026range 10.141463 to 10.141463 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current10.141463 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 1.839823 MW

26 Sep 2026: 1.839823 MW
26 Sep 2026range 1.839823 to 1.839823 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1.839823 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 10.141463 MW

26 Sep 2026: 10.141463 MW
26 Sep 2026range 10.141463 to 10.141463 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current10.141463 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j4jnm6mem8/capacity" \  -H "Authorization: Bearer gc_live_..."
EGREMONT 33 kV substation: grid capacity (SP Electricity North West) · GridCapacity API