Substation / 33 kV / bsp

DROYLSDEN

SP Electricity North West / United Kingdom

Latest published values

5 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available2.526829 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available0.458407 MWConditionalNow (snapshot)variant: synchronous14 Aug 2026
OfftakeLoad (any)Available36.872401 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available36.872401 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable2.526829 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

2.526829 MW

Granted

The operator's latest published dataset reports 2.526829268 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:DROYLSDEN · payload sha256 9f63021255b0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

0.458407 MW

Granted

The operator's latest published dataset reports 0.45840708 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:DROYLSDEN · payload sha256 9f63021255b0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Synchronous

Offtake · Load (any) · Available

36.872401 MW

Granted

The operator's latest published dataset reports 36.872401103 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:DROYLSDEN · payload sha256 9f63021255b0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Non Firm

Offtake · Load (any) · Available

36.872401 MW

Granted

The operator's latest published dataset reports 36.872401103 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:DROYLSDEN · payload sha256 9f63021255b0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

2.526829 MW

Granted

The operator's latest published dataset reports 2.526829268 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:DROYLSDEN · payload sha256 9f63021255b0…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 36.872401 MW

26 Sep 2026: 36.872401 MW
26 Sep 2026range 36.872401 to 36.872401 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current36.872401 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 36.872401 MW

26 Sep 2026: 36.872401 MW
26 Sep 2026range 36.872401 to 36.872401 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current36.872401 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 2.526829 MW

26 Sep 2026: 2.526829 MW
26 Sep 2026range 2.526829 to 2.526829 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2.526829 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 0.458407 MW

26 Sep 2026: 0.458407 MW
26 Sep 2026range 0.458407 to 0.458407 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.458407 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 2.526829 MW

26 Sep 2026: 2.526829 MW
26 Sep 2026range 2.526829 to 2.526829 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2.526829 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j4j0h5mk8r/capacity" \  -H "Authorization: Bearer gc_live_..."
DROYLSDEN 33 kV substation: grid capacity (SP Electricity North West) · GridCapacity API