Skip to content

Substation / 33 kV / bsp

BURNLEY

SP Electricity North West / United Kingdom

Latest published values

5 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available53.712835 MWConditionalNow (snapshot)variant: inverter_based14 Aug 2026
InjectionGeneration (any)Available22.752212 MWConditionalNow (snapshot)variant: synchronous14 Aug 2026
OfftakeLoad (any)Available63.49045 MWConditionalNow (snapshot)14 Aug 2026
OfftakeLoad (any)Available60.67045 MWFirmNow (snapshot)14 Aug 2026
BidirectionalBatteryAvailable53.712835 MWConditionalNow (snapshot)14 Aug 2026

SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

53.712835 MW

Granted

The operator's latest published dataset reports 53.712835443 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: inverter_based
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:BURNLEY · payload sha256 099aed4f51b2…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Inverter Based

Injection · Generation (any) · Available

22.752212 MW

Granted

The operator's latest published dataset reports 22.752212389 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot) · variant: synchronous
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:BURNLEY · payload sha256 099aed4f51b2…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Generation Headroom - N-0 -(MW) / Synchronous

Offtake · Load (any) · Available

63.49045 MW

Granted

The operator's latest published dataset reports 63.490450342 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:BURNLEY · payload sha256 099aed4f51b2…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Non Firm

Offtake · Load (any) · Available

60.67045 MW

Granted

The operator's latest published dataset reports 60.670450342 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:BURNLEY · payload sha256 099aed4f51b2…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Demand Headroom (MW) / Firm

Bidirectional · Battery · Available

53.712835 MW

Granted

The operator's latest published dataset reports 53.712835443 MW under methodology gb_enwl_heatmap_tool_2026.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
gb_enwl_heatmap_tool_2026ENWL Heatmap Tool: primary and BSP headroombasis operator calculated · network state unknown · comparability class gb_enwl_heatmapNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Aug 2026
Retrieved / confirmed
2026-09-26 02:45 UTClast confirmed unchanged 2026-10-02 08:21 UTC
Source health
Healthy
Provenance
gb_enwl_heatmap_toolrecord bsp:BURNLEY · payload sha256 099aed4f51b2…Operator’s publication (opens the operator’s site)
Licence
CC BY 4.0Attribution: SP Electricity North West, Heatmap Tool (CC BY 4.0) (last updated 2026-08-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
Battery Storage Headroom N-0 -(MW)

History

Served series only

Offtake · Load (any) · Available

current 60.67045 MW

26 Sep 2026: 60.67045 MW
26 Sep 2026range 60.67045 to 60.67045 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current60.67045 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 63.49045 MW

26 Sep 2026: 63.49045 MW
26 Sep 2026range 63.49045 to 63.49045 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current63.49045 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 53.712835 MW

26 Sep 2026: 53.712835 MW
26 Sep 2026range 53.712835 to 53.712835 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.712835 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 22.752212 MW

26 Sep 2026: 22.752212 MW
26 Sep 2026range 22.752212 to 22.752212 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current22.752212 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available

current 53.712835 MW

26 Sep 2026: 53.712835 MW
26 Sep 2026range 53.712835 to 53.712835 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current53.712835 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6jnj9v4fbz7j4eb15gk1c/capacity" \  -H "Authorization: Bearer gc_live_..."
BURNLEY 33 kV substation: grid capacity (SP Electricity North West) · GridCapacity API