Skip to content

Busbar / 15 kV

S.MARIA

Edistribución Redes Digitales, S.L.U. / Santa María del Camí, Balears, Illes, Spain

Latest published values

3 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
OfftakeLoad (any)Allocated14.2 MWFirmNow (snapshot)11 Nov 2026
OfftakeLoad (any)Available16.06 MWFirmNow (snapshot)11 Nov 2026
OfftakeLoad (any)Requested0.01 MWFirmNow (snapshot)11 Nov 2026

Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)

What each value means

Methodology, both clocks, provenance and rights

Offtake · Load (any) · Allocated

14.2 MW

Granted

The operator's latest published dataset reports 14.2 MW under methodology es_cnmc_dem_rdd_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
es_cnmc_dem_rdd_2026Firm demand access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_demand_firm_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-11 14:22 UTClast confirmed unchanged 2026-11-22 21:06 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdd:R1-299:S.MARIA:15 · payload sha256 a4aa716ee372…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_OCUPADA

Offtake · Load (any) · Available

16.06 MW

Granted

The operator's latest published dataset reports 16.06 MW under methodology es_cnmc_dem_rdd_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
es_cnmc_dem_rdd_2026Firm demand access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_demand_firm_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-11 14:22 UTClast confirmed unchanged 2026-11-22 21:06 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdd:R1-299:S.MARIA:15 · payload sha256 a4aa716ee372…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DISPONIBLE

Offtake · Load (any) · Requested

0.01 MW

Granted

The operator's latest published dataset reports 0.01 MW under methodology es_cnmc_dem_rdd_2026.

Firmness
Firm
Horizon
Now (snapshot)
Methodology
es_cnmc_dem_rdd_2026Firm demand access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_demand_firm_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-11 14:22 UTClast confirmed unchanged 2026-11-22 21:06 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdd:R1-299:S.MARIA:15 · payload sha256 a4aa716ee372…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ADMITIDA_NO_EVALUADA

History

Served series only

Offtake · Load (any) · Available

current 16.06 MW

26 Sep 2026: 11.42 MW11 Nov 2026: 16.06 MW
26 Sep 2026range 11.42 to 16.06 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202611 Nov 202611.42 MW
11 Nov 2026current16.06 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Allocated

current 14.2 MW

26 Sep 2026: 18.84 MW11 Nov 2026: 14.2 MW
26 Sep 2026range 14.2 to 18.84 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202611 Nov 202618.84 MW
11 Nov 2026current14.2 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested

current 0.01 MW

26 Sep 2026: 0 MW11 Nov 2026: 0.01 MW
26 Sep 2026range 0 to 0.01 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202611 Nov 20260 MW
11 Nov 2026current0.01 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/bus_06gdrjdt0nvyq5gesxeggxkrp4/capacity" \  -H "Authorization: Bearer gc_live_..."