es_cnmc_demand_capacity

CNMC — Mapa de capacidad de acceso de demanda (red de transporte y de distribución)

Published by Comisión Nacional de los Mercados y la Competencia · ES · Monthly

Archived, pending reviewpending_reviewHealthy

Demand access capacity in MW at every Spanish transmission node and distribution busbar, as the regulator compiles it monthly: available by demand type at transmission (CEP with and without voltage-dip ride-through, non-CEP, storage), firm available at distribution, occupied and admitted-not-evaluated.

What is withheld, and why

Every value from this source is withheld. The operator’s terms do not clearly allow us to redistribute its figures, and when signals conflict the more restrictive reading wins until the operator confirms otherwise in writing. Records are still listed — with capacity.value null, access.status "withheld" and a link to the publication — so you know the operator publishes something there.

The publication is still read and kept, because operators overwrite their files and a history not recorded when it happened can never be recovered. If reuse is cleared, customers get the history as well as the present.

The layers, their ArcGIS items (licenseInfo empty) and the landing page carry no licence. CNMC's open-data portal licenses its information for commercial and non-commercial reuse (CC BY-SA 4.0 and Ley 37/2007), but that grant is scoped to the information on the CNMC|Data portal, which has no access-capacity dataset, and Ley 37/2007 excludes documents over which third parties hold rights — these layers are compiled from the operators' submissions, whose own notices reserve commercial use. Pending CNMC's written confirmation (research/dossiers/es.md §13 Q1). Archived, never served.

Licence and rights evidence

Licence
Not stated
Attribution
Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC)required
Technical access
Yes
Commercial use
Not established
May be cached
Not established
May be redistributed
Not established
Derived data allowed
Not established

Evidence

Methodology

2 version(s)

Firm demand access capacity at the distribution networks (each DSO's figures in CNMC's map)

es_cnmc_dem_rdd_2026 · vCircular 1/2024, Especificaciones de Detalle (Resolution 8-06-2025); BOE-A-2025-9913 format

Each distribution operator's monthly firm demand access capacity per busbar (substation x voltage level) under CNMC's common methodology, as CNMC compiles it: firm available, occupied (connected, permits in force and favourable studies) and admitted but not yet evaluated, in MW.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No — do not sum these figures
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
es_rdd_demand_firm_access_cir1_2024

The operator’s own caveats

  • CNMC: 'sus valores no pueden computarse como directamente sumables' — informative, not additive, also across the voltage levels of one substation.

Demand access capacity at the transmission network (REE's figures in CNMC's map)

es_cnmc_dem_rdt_2026 · vCircular 1/2024 and its Especificaciones de Detalle (Resolution 1-12-2025, BOE-A-2025-25253), as published by REE

REE's monthly demand access-capacity study for every transmission node, as CNMC republishes it: the capacity available for requests under the general criterion by demand type (power-electronics CEP with and without voltage-dip ride-through, non-CEP, storage), the capacity granted and the capacity admitted but not yet evaluated.

Capacity basis
operator calculated
Network state
unknown
Binding
No
Additive across assets
No — do not sum these figures
The method accounts for
reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Comparability class
es_rdt_demand_access_cir1_2024

The operator’s own caveats

  • CNMC: 'sus valores no pueden computarse como directamente sumables'; access requests must still go to the network operator.
  • A 0 may be REE's blank (reference value not agreed with the DSO) rewritten by CNMC; see the flag zero_may_mean_not_published.

How the publication maps to the model

availability types
["available","allocated","requested"]
binding
false
directions
["offtake"]
firmness
["firm","unknown"]
geometry precision
exact
includes reserved projects
null
non additive
true
notes
["Transmission (Demanda_en_Transporte_v2, 937 REE nodes): available for requests under the general criterion, as REE's demand file columns 55-59 (verified on 867 unique-key nodes): CEP demand with voltage-dip ride-through (CAP_DEMANDA_CEP_CAD1, variant cep_ch), CEP without it (CAP_DEMANDA_CEP_CAD2, cep_sh; 0 at every node), non-CEP (no_cep), storage CEP and non-CEP; granted (CAP_OCUPADA, CAP_ALM_OCUPADA; allocated) and admitted-not-evaluated (requested). REE labels no firmness at transmission: unknown.","Distribution (Demanda_en_Distribucion, 6,186 busbars of 61 DSOs): 'capacidad firme disponible' (available, firm, BOE-A-2025-9913), occupied and admitted-not-evaluated, all firm.","CNMC writes 0 where REE left a demand cell blank because the reference value was not agreed with the DSO (291 of 867 checked nodes): a 0 in the transmission layer's available fields is flagged zero_may_mean_not_published. REE's own file (es_ree_demand_access_capacity) keeps them blank.","The transmission layer has no node code: its key is SUBESTACION and NIVEL_TENSION, and the 19 binudo pairs that share both are told apart by OBJECTID order only (identity_confidence = low). Distribution busbars are keyed as in the generation map, with ordinals where i-DE's keys repeat (892 groups).","Two i-DE rows (STR PRADO POZUELO) carry coordinates outside Spain; their geometry is withheld and recorded, never corrected."]
spatial scope
busbar
technologies
["generic_load","storage_other"]
units
["MW"]

Query this source

curl "https://api.gridcapacityapi.com/v1/capacity/search?source=es_cnmc_demand_capacity&limit=20" \  -H "Authorization: Bearer gc_live_..."
CNMC — Mapa de capacidad de acceso de demanda (red de transporte y de distribución) (Comisión Nacional de los Mercados y la Competencia): licence, methodology and freshness · GridCapacity API