Skip to content

Node / 220 kV / transmission

CILLAMAYOR

Red Eléctrica de España, S.A.U. / Barruelo de Santullán, Palencia, Spain

Latest published values

9 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
OfftakeLoad (any)Allocated0 MWUnknownNow (snapshot)variant: rdt9 Sep 2026
OfftakeLoad (any)Available111.3 MWUnknownNow (snapshot)variant: no_cep14 Oct 2026
OfftakeLoad (any)Available53.01 MWUnknownNow (snapshot)variant: cep_ch14 Oct 2026
OfftakeLoad (any)Available0 MWUnknownNow (snapshot)variant: cep_sh9 Sep 2026
OfftakeLoad (any)Requested0 MWUnknownNow (snapshot)variant: rdt9 Sep 2026
OfftakeOther storageAllocated0 MWUnknownNow (snapshot)variant: rdt9 Sep 2026
OfftakeOther storageAvailable242.74 MWUnknownNow (snapshot)variant: cep14 Oct 2026
OfftakeOther storageAvailable242.74 MWUnknownNow (snapshot)variant: no_cep14 Oct 2026
OfftakeOther storageRequested155.4 MWUnknownNow (snapshot)variant: rdt11 Nov 2026

Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-10-14)Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)

What each value means

Methodology, both clocks, provenance and rights

Offtake · Load (any) · Allocated

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rdt
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 eeb84838e8c0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_OCUPADA

Offtake · Load (any) · Available

111.3 MW

Granted

The operator's latest published dataset reports 111.3 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: no_cep
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Oct 2026
Retrieved / confirmed
2026-10-14 12:00 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 ea9ff890545f…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-10-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DEMANDA_NOCEP

Offtake · Load (any) · Available

53.01 MW

Granted

The operator's latest published dataset reports 53.01 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: cep_ch
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Oct 2026
Retrieved / confirmed
2026-10-14 12:00 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 ea9ff890545f…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-10-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DEMANDA_CEP_CAD1

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: cep_sh
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 eeb84838e8c0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DEMANDA_CEP_CAD2
Operator note: zero may mean not published
true

Offtake · Load (any) · Requested

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rdt
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 eeb84838e8c0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ADMITIDA_NO_EVALUADA

Offtake · Other storage · Allocated

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rdt
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:56 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 eeb84838e8c0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ALM_OCUPADA

Offtake · Other storage · Available

242.74 MW

Granted

The operator's latest published dataset reports 242.74 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: cep
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Oct 2026
Retrieved / confirmed
2026-10-14 12:00 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 ea9ff890545f…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-10-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ALM_CEP

Offtake · Other storage · Available

242.74 MW

Granted

The operator's latest published dataset reports 242.74 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: no_cep
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
14 Oct 2026
Retrieved / confirmed
2026-10-14 12:00 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 ea9ff890545f…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-10-14)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ALM_NOCEP

Offtake · Other storage · Requested

155.4 MW

Granted

The operator's latest published dataset reports 155.4 MW under methodology es_cnmc_dem_rdt_2026.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rdt
Methodology
es_cnmc_dem_rdt_2026Demand access capacity at the transmission network (REE's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdt_demand_access_cir1_2024Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-11 14:22 UTClast confirmed unchanged 2026-11-21 21:24 UTC
Source health
Healthy
Provenance
es_cnmc_demand_capacityrecord rdt:CILLAMAYOR 220 · payload sha256 3c0c8908b06a…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ALM_ADMITIDA_NO_EVALUADA

History

Served series only

Offtake · Load (any) · Available

current 53.01 MW

26 Sep 2026: 53 MW14 Oct 2026: 53.01 MW
26 Sep 2026range 53 to 53.01 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 202653 MW
14 Oct 2026current53.01 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW24 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available

current 111.3 MW

26 Sep 2026: 96.99 MW14 Oct 2026: 111.3 MW
26 Sep 2026range 96.99 to 111.3 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 202696.99 MW
14 Oct 2026current111.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Other storage · Available

current 242.74 MW

26 Sep 2026: 234.07 MW14 Oct 2026: 242.74 MW
26 Sep 2026range 234.07 to 242.74 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 2026234.07 MW
14 Oct 2026current242.74 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Other storage · Available

current 242.74 MW

26 Sep 2026: 234.07 MW14 Oct 2026: 242.74 MW
26 Sep 2026range 234.07 to 242.74 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 2026234.07 MW
14 Oct 2026current242.74 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Allocated

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW24 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Other storage · Allocated

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW24 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Requested

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW24 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Other storage · Requested

current 155.4 MW

26 Sep 2026: 205.3 MW11 Nov 2026: 155.4 MW
26 Sep 2026range 155.4 to 205.3 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202611 Nov 2026205.3 MW
11 Nov 2026current155.4 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API