Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionSolar PVConnected5,469.46 kVAUnknownNow (snapshot)31 Oct 2026
InjectionSolar PVConnected833UnknownNow (snapshot)variant: installations31 Oct 2026

Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Solar PV · Connected

5,469.46 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5469.46 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord VOEREN|ZONNE-ENERGIE · payload sha256 9aa01aea8a05…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS LIMBURG
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

833

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 833 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord VOEREN|ZONNE-ENERGIE · payload sha256 9aa01aea8a05…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS LIMBURG
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

History

Served series only

Injection · Solar PV · Connected

current 5,469.46 kVA

26 Sep 2026: 5,429.36 kVA8 Oct 2026: 5,455.66 kVA9 Oct 2026: 906.6 kVA5 Nov 2026: 5,469.46 kVA
26 Sep 2026range 906.6 to 5,469.46 kVA11 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 20265,429.36 kVA
8 Oct 20269 Oct 20265,455.66 kVA
9 Oct 20265 Nov 2026906.6 kVA
5 Nov 2026current5,469.46 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 833

26 Sep 2026: 8308 Oct 2026: 8319 Oct 2026: 135 Nov 2026: 833
26 Sep 2026range 13 to 83311 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 2026830
8 Oct 20269 Oct 2026831
9 Oct 20265 Nov 202613
5 Nov 2026current833

Time axis: when we observed each value, not the operator’s effective date.

Through the API