| Injection | Generation (any) | Available | 25.5 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 18.8 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 5.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 286.1 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 38.4 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 14.1 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 79.7 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 24.2 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 25.5 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 18.8 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 5.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 286.1 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 38.4 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 14.1 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 79.7 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 24.2 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Generation (any) | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 225.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 36.4 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 9.6 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 225.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 48.9 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 9.6 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Solar PV | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 27.7 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 27.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 9.3 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 186.3 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 28.6 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 27.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 9.3 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 186.3 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 175 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Injection | Onshore wind | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 36.3 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 12.1 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 7 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 67.2 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 31.7 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 20.9 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 130.7 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 46.1 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 38.1 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 102.3 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 36.3 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 12.1 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 7 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 67.2 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 31.7 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 29.7 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 130.7 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 46.1 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 41.2 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 102.3 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Offtake | Load (any) | Available | 50 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 25.5 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 12 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 5.2 MW | Firm, ≤ 0 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 57 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 22.9 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 14.1 MW | Flexible, ≤ 5 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 110.3 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 27.4 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 24.2 MW | Flexible, ≤ 10 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 39.1 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 38.5 MW | Flexible, ≤ 20 % curtailment a year | 2027 (2027)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 25.5 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 12 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 5.2 MW | Firm, ≤ 0 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 57 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 22.9 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 14.1 MW | Flexible, ≤ 5 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 110.3 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 27.4 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 24.2 MW | Flexible, ≤ 10 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 300 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 380kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 39.1 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 220kv | 26 Sep 2026 |
| Bidirectional | Battery | Available | 38.5 MW | Flexible, ≤ 20 % curtailment a year | 2031 (2031)variant: 70kv | 26 Sep 2026 |