OOSTKAMP

Fluvius System Operator · OOSTKAMP, Belgium

Latest published values

12 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionOtherConnected9.9 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected0.75 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected2,676 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected9.9 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionSolar PVConnected34,508.78 kVAUnknownNow (snapshot)31 Aug 2026
InjectionSolar PVConnected5,302UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOnshore windConnected17,063 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOnshore windConnected6UnknownNow (snapshot)variant: installations31 Aug 2026

Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Other · Connected

9.9 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9.9 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|BIOMASSA (GEEN WKK) · payload sha256 afe233b3cc50…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
BIOMASSA (GEEN WKK)

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|BIOMASSA (GEEN WKK) · payload sha256 afe233b3cc50…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
BIOMASSA (GEEN WKK)
Operator note: variant
installations

Injection · Other · Connected

0.75 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 0.75 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|BRANDSTOFCEL · payload sha256 bfd38a6420f6…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
BRANDSTOFCEL

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|BRANDSTOFCEL · payload sha256 bfd38a6420f6…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
BRANDSTOFCEL
Operator note: variant
installations

Injection · Other · Connected

2,676 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2676 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WKK AARDGAS · payload sha256 fa3a7b8af4f8…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK AARDGAS

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WKK AARDGAS · payload sha256 fa3a7b8af4f8…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK AARDGAS
Operator note: variant
installations

Injection · Other · Connected

9.9 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9.9 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WKK BIOMASSA/BIOGAS · payload sha256 d136beb7581c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK BIOMASSA/BIOGAS

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WKK BIOMASSA/BIOGAS · payload sha256 d136beb7581c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK BIOMASSA/BIOGAS
Operator note: variant
installations

Injection · Solar PV · Connected

34,508.78 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 34508.78 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|ZONNE-ENERGIE · payload sha256 de7b43ed6e5c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

5,302

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5302 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|ZONNE-ENERGIE · payload sha256 de7b43ed6e5c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

Injection · Onshore wind · Connected

17,063 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 17063 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WINDENERGIE · payload sha256 0577f6aabc5e…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WINDENERGIE

Injection · Onshore wind · Connected

6

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 6 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTKAMP|WINDENERGIE · payload sha256 0577f6aabc5e…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WINDENERGIE
Operator note: variant
installations

History

Served series only

Injection · Other · Connected

current 9.9 kVA

26 Sep 2026: 9.9 kVA
26 Sep 2026range 9.9–9.9 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current9.9 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 0.75 kVA

26 Sep 2026: 0.75 kVA
26 Sep 2026range 0.75–0.75 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.75 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 17,063 kVA

26 Sep 2026: 17,063 kVA
26 Sep 2026range 17,063–17,063 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current17,063 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 6

26 Sep 2026: 6
26 Sep 2026range 6–626 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 2,676 kVA

26 Sep 2026: 2,676 kVA
26 Sep 2026range 2,676–2,676 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,676 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 9.9 kVA

26 Sep 2026: 9.9 kVA
26 Sep 2026range 9.9–9.9 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current9.9 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 34,508.78 kVA

26 Sep 2026: 34,508.78 kVA
26 Sep 2026range 34,508.78–34,508.78 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current34,508.78 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 5,302

26 Sep 2026: 5,302
26 Sep 2026range 5,302–5,30226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5,302

Time axis: when we observed each value, not the operator’s effective date.