Skip to content

Area

OOSTENDE

Fluvius System Operator / OOSTENDE, Belgium

Latest published values

12 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionOtherConnected295 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected2,220 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected2UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected162 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected3UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected5,500 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionSolar PVConnected76,757.86 kVAUnknownNow (snapshot)31 Oct 2026
InjectionSolar PVConnected7,774UnknownNow (snapshot)variant: installations31 Oct 2026
InjectionOnshore windConnected166 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOnshore windConnected3UnknownNow (snapshot)variant: installations31 Aug 2026

Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Other · Connected

295 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 295 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|NOODGROEP TYPE1 · payload sha256 044edf6b29bb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
NOODGROEP TYPE1

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|NOODGROEP TYPE1 · payload sha256 044edf6b29bb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
NOODGROEP TYPE1
Operator note: variant
installations

Injection · Other · Connected

2,220 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2220 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|NOODGROEP TYPE2 · payload sha256 41059a13b57d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
NOODGROEP TYPE2

Injection · Other · Connected

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|NOODGROEP TYPE2 · payload sha256 41059a13b57d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
NOODGROEP TYPE2
Operator note: variant
installations

Injection · Other · Connected

162 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 162 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WKK AARDGAS · payload sha256 31a590a3a110…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK AARDGAS

Injection · Other · Connected

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WKK AARDGAS · payload sha256 31a590a3a110…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK AARDGAS
Operator note: variant
installations

Injection · Other · Connected

5,500 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5500 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WKK BIOMASSA/BIOGAS · payload sha256 996d8234761e…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK BIOMASSA/BIOGAS

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WKK BIOMASSA/BIOGAS · payload sha256 996d8234761e…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WKK BIOMASSA/BIOGAS
Operator note: variant
installations

Injection · Solar PV · Connected

76,757.86 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 76757.86 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|ZONNE-ENERGIE · payload sha256 1cf786df5f5c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

7,774

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 7774 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|ZONNE-ENERGIE · payload sha256 1cf786df5f5c…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

Injection · Onshore wind · Connected

166 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 166 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WINDENERGIE · payload sha256 ab69d2e00a2d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WINDENERGIE

Injection · Onshore wind · Connected

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord OOSTENDE|WINDENERGIE · payload sha256 ab69d2e00a2d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS IMEWO
Operator note: technologie
WINDENERGIE
Operator note: variant
installations

History

Served series only

Injection · Other · Connected

current 295 kVA

26 Sep 2026: 295 kVA
26 Sep 2026range 295 to 295 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current295 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1 to 111 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 2,220 kVA

26 Sep 2026: 2,220 kVA
26 Sep 2026range 2,220 to 2,220 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,220 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 2

26 Sep 2026: 2
26 Sep 2026range 2 to 211 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 166 kVA

26 Sep 2026: 166 kVA
26 Sep 2026range 166 to 166 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current166 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 3

26 Sep 2026: 3
26 Sep 2026range 3 to 311 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 162 kVA

26 Sep 2026: 162 kVA
26 Sep 2026range 162 to 162 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current162 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 3

26 Sep 2026: 3
26 Sep 2026range 3 to 311 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 5,500 kVA

26 Sep 2026: 5,500 kVA
26 Sep 2026range 5,500 to 5,500 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5,500 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1 to 111 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 76,757.86 kVA

26 Sep 2026: 75,927.41 kVA8 Oct 2026: 76,888.91 kVA9 Oct 2026: 49,120.47 kVA5 Nov 2026: 76,757.86 kVA
26 Sep 2026range 49,120.47 to 76,888.91 kVA11 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 202675,927.41 kVA
8 Oct 20269 Oct 202676,888.91 kVA
9 Oct 20265 Nov 202649,120.47 kVA
5 Nov 2026current76,757.86 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 7,774

26 Sep 2026: 7,6848 Oct 2026: 7,7419 Oct 2026: 1575 Nov 2026: 7,774
26 Sep 2026range 157 to 7,77411 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 20267,684
8 Oct 20269 Oct 20267,741
9 Oct 20265 Nov 2026157
5 Nov 2026current7,774

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/area_06gdq6ad4dsh53bq8n7c62ncf0/capacity" \  -H "Authorization: Bearer gc_live_..."