Skip to content

Area

MEERHOUT

Fluvius System Operator / MEERHOUT, Belgium

Latest published values

8 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionOtherConnected1 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected2,590 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected3UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionSolar PVConnected15,635.21 kVAUnknownNow (snapshot)31 Oct 2026
InjectionSolar PVConnected2,322UnknownNow (snapshot)variant: installations31 Oct 2026
InjectionOnshore windConnected10,500 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOnshore windConnected1UnknownNow (snapshot)variant: installations31 Aug 2026

Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Other · Connected

1 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WKK AARDGAS · payload sha256 458d1ad32e20…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WKK AARDGAS

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WKK AARDGAS · payload sha256 458d1ad32e20…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WKK AARDGAS
Operator note: variant
installations

Injection · Other · Connected

2,590 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2590 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WKK BIOMASSA/BIOGAS · payload sha256 bcc8a70edd3d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WKK BIOMASSA/BIOGAS

Injection · Other · Connected

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WKK BIOMASSA/BIOGAS · payload sha256 bcc8a70edd3d…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WKK BIOMASSA/BIOGAS
Operator note: variant
installations

Injection · Solar PV · Connected

15,635.21 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 15635.21 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|ZONNE-ENERGIE · payload sha256 55a6d1418870…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

2,322

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2322 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|ZONNE-ENERGIE · payload sha256 55a6d1418870…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

Injection · Onshore wind · Connected

10,500 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 10500 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WINDENERGIE · payload sha256 71b164f40581…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WINDENERGIE

Injection · Onshore wind · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord MEERHOUT|WINDENERGIE · payload sha256 71b164f40581…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS KEMPEN
Operator note: technologie
WINDENERGIE
Operator note: variant
installations

History

Served series only

Injection · Onshore wind · Connected

current 10,500 kVA

26 Sep 2026: 10,500 kVA
26 Sep 2026range 10,500 to 10,500 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current10,500 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1 to 111 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1 kVA

26 Sep 2026: 1 kVA
26 Sep 2026range 1 to 1 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1 to 111 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 2,590 kVA

26 Sep 2026: 2,590 kVA
26 Sep 2026range 2,590 to 2,590 kVA11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,590 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 3

26 Sep 2026: 3
26 Sep 2026range 3 to 311 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 15,635.21 kVA

26 Sep 2026: 15,531.69 kVA8 Oct 2026: 15,593.09 kVA9 Oct 2026: 4,674.2 kVA5 Nov 2026: 15,635.21 kVA
26 Sep 2026range 4,674.2 to 15,635.21 kVA11 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 202615,531.69 kVA
8 Oct 20269 Oct 202615,593.09 kVA
9 Oct 20265 Nov 20264,674.2 kVA
5 Nov 2026current15,635.21 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 2,322

26 Sep 2026: 2,3108 Oct 2026: 2,3189 Oct 2026: 285 Nov 2026: 2,322
26 Sep 2026range 28 to 2,32211 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 20262,310
8 Oct 20269 Oct 20262,318
9 Oct 20265 Nov 202628
5 Nov 2026current2,322

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/area_06gdq6ad4dsh53bq8mya6ekv80/capacity" \  -H "Authorization: Bearer gc_live_..."