Skip to content
GridCapacityAPI.com

Area

KORTRIJK

Fluvius System Operator · KORTRIJK, Belgium

Latest published values

14 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionOtherConnected6.25 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected5UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected3,200 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected2UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected1,650 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected5UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected9 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOtherConnected8.16 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected1UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionSolar PVConnected94,330.3 kVAUnknownNow (snapshot)31 Aug 2026
InjectionSolar PVConnected13,539UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOnshore windConnected6,216.5 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOnshore windConnected2UnknownNow (snapshot)variant: installations31 Aug 2026

Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Other · Connected

6.25 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 6.25 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|BRANDSTOFCEL · payload sha256 aaf692060b1f…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
BRANDSTOFCEL

Injection · Other · Connected

5

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|BRANDSTOFCEL · payload sha256 aaf692060b1f…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
BRANDSTOFCEL
Operator note: variant
installations

Injection · Other · Connected

3,200 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3200 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|NOODGROEP TYPE2 · payload sha256 3e2ca102901b…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
NOODGROEP TYPE2

Injection · Other · Connected

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|NOODGROEP TYPE2 · payload sha256 3e2ca102901b…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
NOODGROEP TYPE2
Operator note: variant
installations

Injection · Other · Connected

1,650 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1650 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK AARDGAS · payload sha256 335d3b8c1429…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK AARDGAS

Injection · Other · Connected

5

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK AARDGAS · payload sha256 335d3b8c1429…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK AARDGAS
Operator note: variant
installations

Injection · Other · Connected

9 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 9 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK BIOMASSA/BIOGAS · payload sha256 46cdec4452f1…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK BIOMASSA/BIOGAS

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK BIOMASSA/BIOGAS · payload sha256 46cdec4452f1…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK BIOMASSA/BIOGAS
Operator note: variant
installations

Injection · Other · Connected

8.16 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 8.16 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK DIESEL · payload sha256 3baddff08ffb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK DIESEL

Injection · Other · Connected

1

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WKK DIESEL · payload sha256 3baddff08ffb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WKK DIESEL
Operator note: variant
installations

Injection · Solar PV · Connected

94,330.3 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 94330.3 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|ZONNE-ENERGIE · payload sha256 b3059302a687…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

13,539

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 13539 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|ZONNE-ENERGIE · payload sha256 b3059302a687…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

Injection · Onshore wind · Connected

6,216.5 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 6216.5 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WINDENERGIE · payload sha256 97959acae600…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WINDENERGIE

Injection · Onshore wind · Connected

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord KORTRIJK|WINDENERGIE · payload sha256 97959acae600…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS WEST
Operator note: technologie
WINDENERGIE
Operator note: variant
installations

History

Served series only

Injection · Other · Connected

current 6.25 kVA

26 Sep 2026: 6.25 kVA
26 Sep 2026range 6.25–6.25 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6.25 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 5

26 Sep 2026: 5
26 Sep 2026range 5–526 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 3,200 kVA

26 Sep 2026: 3,200 kVA
26 Sep 2026range 3,200–3,200 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3,200 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 2

26 Sep 2026: 2
26 Sep 2026range 2–226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 6,216.5 kVA

26 Sep 2026: 6,216.5 kVA
26 Sep 2026range 6,216.5–6,216.5 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6,216.5 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 2

26 Sep 2026: 2
26 Sep 2026range 2–226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1,650 kVA

26 Sep 2026: 1,650 kVA
26 Sep 2026range 1,650–1,650 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1,650 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 5

26 Sep 2026: 5
26 Sep 2026range 5–526 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 9 kVA

26 Sep 2026: 9 kVA
26 Sep 2026range 9–9 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current9 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 8.16 kVA

26 Sep 2026: 8.16 kVA
26 Sep 2026range 8.16–8.16 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current8.16 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 1

26 Sep 2026: 1
26 Sep 2026range 1–126 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 14 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/area_06gdq6ad4dsh53bq8mane6vcv8/capacity" \  -H "Authorization: Bearer gc_live_..."
KORTRIJK area: grid capacity (Fluvius System Operator) · GridCapacity API