Skip to content

Area

HOEILAART

Fluvius System Operator / HOEILAART, Belgium

Latest published values

2 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionSolar PVConnected8,006.27 kVAUnknownNow (snapshot)31 Oct 2026
InjectionSolar PVConnected1,614UnknownNow (snapshot)variant: installations31 Oct 2026

Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Solar PV · Connected

8,006.27 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 8006.27 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord HOEILAART|ZONNE-ENERGIE · payload sha256 3a9c33c9562b…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS ZENNE-DIJLE
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

1,614

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 1614 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Oct 2026
Retrieved / confirmed
2026-11-05 08:20 UTClast confirmed unchanged 2026-11-09 02:55 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord HOEILAART|ZONNE-ENERGIE · payload sha256 3a9c33c9562b…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-10-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS ZENNE-DIJLE
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

History

Served series only

Injection · Solar PV · Connected

current 8,006.27 kVA

26 Sep 2026: 7,746.77 kVA8 Oct 2026: 8,043.09 kVA9 Oct 2026: 372.5 kVA5 Nov 2026: 8,006.27 kVA
26 Sep 2026range 372.5 to 8,043.09 kVA11 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 20267,746.77 kVA
8 Oct 20269 Oct 20268,043.09 kVA
9 Oct 20265 Nov 2026372.5 kVA
5 Nov 2026current8,006.27 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 1,614

26 Sep 2026: 1,5818 Oct 2026: 1,5999 Oct 2026: 75 Nov 2026: 1,614
26 Sep 2026range 7 to 1,61411 Nov 2026
4 published values, as a table
Observed fromUntilValue
26 Sep 20268 Oct 20261,581
8 Oct 20269 Oct 20261,599
9 Oct 20265 Nov 20267
5 Nov 2026current1,614

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/area_06gdq6ad4dsh53bq8kva36y544/capacity" \  -H "Authorization: Bearer gc_live_..."