Skip to content
GridCapacityAPI.com

Area

DENDERLEEUW

Fluvius System Operator · DENDERLEEUW, Belgium

Latest published values

6 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionOtherConnected5,792 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOtherConnected3UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionSolar PVConnected14,080.37 kVAUnknownNow (snapshot)31 Aug 2026
InjectionSolar PVConnected2,992UnknownNow (snapshot)variant: installations31 Aug 2026
InjectionOnshore windConnected6,760 kVAUnknownNow (snapshot)31 Aug 2026
InjectionOnshore windConnected2UnknownNow (snapshot)variant: installations31 Aug 2026

Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)

What each value means

Methodology, both clocks, provenance and rights

Injection · Other · Connected

5,792 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 5792 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|WKK BIOMASSA/BIOGAS · payload sha256 b7c4ca8caaeb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
WKK BIOMASSA/BIOGAS

Injection · Other · Connected

3

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 3 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|WKK BIOMASSA/BIOGAS · payload sha256 b7c4ca8caaeb…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
WKK BIOMASSA/BIOGAS
Operator note: variant
installations

Injection · Solar PV · Connected

14,080.37 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 14080.37 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|ZONNE-ENERGIE · payload sha256 ce23b548fb32…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
ZONNE-ENERGIE

Injection · Solar PV · Connected

2,992

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2992 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|ZONNE-ENERGIE · payload sha256 ce23b548fb32…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
ZONNE-ENERGIE
Operator note: variant
installations

Injection · Onshore wind · Connected

6,760 kVA

Published in kVA; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 6760 kVA under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|WINDENERGIE · payload sha256 492648f9443f…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
WINDENERGIE

Injection · Onshore wind · Connected

2

Published in count; no MW figure is derived from it.

Granted

The operator's latest published dataset reports 2 count under methodology be_fluvius_lp_per_gemeente.

Firmness
Unknown
Horizon
Now (snapshot) · variant: installations
Methodology
be_fluvius_lp_per_gemeenteFluvius: connected local production per municipality and technologybasis operator published · network state unknown · comparability class be_fluvius_connected_productionNot additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
31 Aug 2026
Retrieved / confirmed
2026-09-26 02:44 UTClast confirmed unchanged 2026-09-26 02:44 UTC
Source health
Healthy
Provenance
be_fluvius_connected_per_municipalityrecord DENDERLEEUW|WINDENERGIE · payload sha256 492648f9443f…Operator’s publication (opens the operator’s site)
Licence
Licentie open data FluviusAttribution: Bron: Fluvius — Open Data, 'Lokale productie per gemeente' (opendata.fluvius.be, dataset 1_33); datum van de laatste bijwerking: source_effective_at van het record (last updated 2026-08-31)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: dnb
FLUVIUS MIDDEN-VLAANDEREN
Operator note: technologie
WINDENERGIE
Operator note: variant
installations

History

Served series only

Injection · Onshore wind · Connected

current 6,760 kVA

26 Sep 2026: 6,760 kVA
26 Sep 2026range 6,760–6,760 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current6,760 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Onshore wind · Connected

current 2

26 Sep 2026: 2
26 Sep 2026range 2–226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 5,792 kVA

26 Sep 2026: 5,792 kVA
26 Sep 2026range 5,792–5,792 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current5,792 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Other · Connected

current 3

26 Sep 2026: 3
26 Sep 2026range 3–326 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current3

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 14,080.37 kVA

26 Sep 2026: 14,080.37 kVA
26 Sep 2026range 14,080.37–14,080.37 kVA26 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current14,080.37 kVA

Time axis: when we observed each value, not the operator’s effective date.

Injection · Solar PV · Connected

current 2,992

26 Sep 2026: 2,992
26 Sep 2026range 2,992–2,99226 Sep 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current2,992

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/area_06gdq6ad4dsh53bq8k22ndn6vm/capacity" \  -H "Authorization: Bearer gc_live_..."
DENDERLEEUW area: grid capacity (Fluvius System Operator) · GridCapacity API