Substation / 150 kV

ANS

Elia Transmission Belgium / Belgium

Latest published values

80 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available4.3 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionGeneration (any)Available0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available20.8 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available38.1 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available128.8 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available4.4 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionGeneration (any)Available0 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available22.1 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available38.1 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionGeneration (any)Available128.8 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable20.4 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable39.8 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable49.9 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable101 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable20.4 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable39.8 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable49.9 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionSolar PVAvailable101 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable11.6 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionOnshore windAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable51.8 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable131.6 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable175 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable11.6 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionOnshore windAvailable0 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable51.8 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable131.6 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
InjectionOnshore windAvailable175 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available4.2 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
OfftakeLoad (any)Available0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available21.6 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available34.4 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available70.2 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available4.2 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
OfftakeLoad (any)Available0 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available21.6 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available34.4 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
OfftakeLoad (any)Available70.2 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 150kv17 Oct 2026
OfftakeLoad (any)Available0 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable4.2 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable19.1 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable26.6 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable37.8 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable4.2 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable19.1 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable26.6 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailable37.8 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 150kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 70kv26 Sep 2026

Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

4.3 MW

Granted

The operator's latest published dataset reports 4.3 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

20.8 MW

Granted

The operator's latest published dataset reports 20.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

38.1 MW

Granted

The operator's latest published dataset reports 38.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

128.8 MW

Granted

The operator's latest published dataset reports 128.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

4.4 MW

Granted

The operator's latest published dataset reports 4.4 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

22.1 MW

Granted

The operator's latest published dataset reports 22.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

38.1 MW

Granted

The operator's latest published dataset reports 38.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Generation (any) · Available

128.8 MW

Granted

The operator's latest published dataset reports 128.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

20.4 MW

Granted

The operator's latest published dataset reports 20.4 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

39.8 MW

Granted

The operator's latest published dataset reports 39.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

49.9 MW

Granted

The operator's latest published dataset reports 49.9 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

101 MW

Granted

The operator's latest published dataset reports 101 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

20.4 MW

Granted

The operator's latest published dataset reports 20.4 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

39.8 MW

Granted

The operator's latest published dataset reports 39.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

49.9 MW

Granted

The operator's latest published dataset reports 49.9 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Solar PV · Available

101 MW

Granted

The operator's latest published dataset reports 101 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

11.6 MW

Granted

The operator's latest published dataset reports 11.6 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

51.8 MW

Granted

The operator's latest published dataset reports 51.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

131.6 MW

Granted

The operator's latest published dataset reports 131.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

175 MW

Granted

The operator's latest published dataset reports 175 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

11.6 MW

Granted

The operator's latest published dataset reports 11.6 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

51.8 MW

Granted

The operator's latest published dataset reports 51.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

131.6 MW

Granted

The operator's latest published dataset reports 131.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Injection · Onshore wind · Available

175 MW

Granted

The operator's latest published dataset reports 175 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

4.2 MW

Granted

The operator's latest published dataset reports 4.2 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

21.6 MW

Granted

The operator's latest published dataset reports 21.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

34.4 MW

Granted

The operator's latest published dataset reports 34.4 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

70.2 MW

Granted

The operator's latest published dataset reports 70.2 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 10683e98a169…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

4.2 MW

Granted

The operator's latest published dataset reports 4.2 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

21.6 MW

Granted

The operator's latest published dataset reports 21.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

34.4 MW

Granted

The operator's latest published dataset reports 34.4 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Offtake · Load (any) · Available

70.2 MW

Granted

The operator's latest published dataset reports 70.2 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 755db9425013…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Offtake · Load (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

4.2 MW

Granted

The operator's latest published dataset reports 4.2 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

19.1 MW

Granted

The operator's latest published dataset reports 19.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

26.6 MW

Granted

The operator's latest published dataset reports 26.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

37.8 MW

Granted

The operator's latest published dataset reports 37.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 150 · payload sha256 b78018bbf180…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

4.2 MW

Granted

The operator's latest published dataset reports 4.2 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
0%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
0%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

19.1 MW

Granted

The operator's latest published dataset reports 19.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
5%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
5%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

26.6 MW

Granted

The operator's latest published dataset reports 26.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
10%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
10%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

Bidirectional · Battery · Available

37.8 MW

Granted

The operator's latest published dataset reports 37.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 150kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 150 · payload sha256 575f6edd3c85…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 150
Operator note: flexibilityLevel
20%_flex
Operator note: variant
150kv
Operator note: voltage kv
150

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/ANS 70 · payload sha256 e7fc8021b4e7…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
ANS 70
Operator note: disclaimer
70 kV connection point to be replaced by 150 kV.
Operator note: flexibilityLevel
20%_flex
Operator note: unavailable
true
Operator note: variant
70kv
Operator note: voltage kv
70

History

Served series only

Bidirectional · Battery · Available · 2027

current 4.2 MW

26 Sep 2026: 4.2 MW
26 Sep 2026range 4.2 to 4.2 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.2 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 19.1 MW

26 Sep 2026: 19.1 MW
26 Sep 2026range 19.1 to 19.1 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current19.1 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 26.6 MW

26 Sep 2026: 26.6 MW
26 Sep 2026range 26.6 to 26.6 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current26.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 37.8 MW

26 Sep 2026: 37.8 MW
26 Sep 2026range 37.8 to 37.8 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current37.8 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 4.2 MW

26 Sep 2026: 4.2 MW
26 Sep 2026range 4.2 to 4.2 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.2 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 21.6 MW

26 Sep 2026: 21.8 MW17 Oct 2026: 21.6 MW
26 Sep 2026range 21.6 to 21.8 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 202621.8 MW
17 Oct 2026current21.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 34.4 MW

26 Sep 2026: 34.5 MW17 Oct 2026: 34.4 MW
26 Sep 2026range 34.4 to 34.5 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 202634.5 MW
17 Oct 2026current34.4 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 70.2 MW

26 Sep 2026: 70.5 MW17 Oct 2026: 70.2 MW
26 Sep 2026range 70.2 to 70.5 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 202670.5 MW
17 Oct 2026current70.2 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 4.3 MW

26 Sep 2026: 4.3 MW
26 Sep 2026range 4.3 to 4.3 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current4.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 20.8 MW

26 Sep 2026: 21.8 MW17 Oct 2026: 20.8 MW
26 Sep 2026range 20.8 to 21.8 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 202621.8 MW
17 Oct 2026current20.8 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 38.1 MW

26 Sep 2026: 38 MW17 Oct 2026: 38.1 MW
26 Sep 2026range 38 to 38.1 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 202638 MW
17 Oct 2026current38.1 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 128.8 MW

26 Sep 2026: 128.1 MW17 Oct 2026: 128.8 MW
26 Sep 2026range 128.1 to 128.8 MW11 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202617 Oct 2026128.1 MW
17 Oct 2026current128.8 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 80 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdrm9kz9s6998k21rfm44x84/capacity" \  -H "Authorization: Bearer gc_live_..."