Substation · 70 kV

AMEL

Elia Transmission Belgium · Belgium

Latest published values

0 served · 20 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)AvailablewithheldFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)AvailablewithheldFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)AvailablewithheldFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionGeneration (any)AvailablewithheldFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailablewithheldFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailablewithheldFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailablewithheldFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionSolar PVAvailablewithheldFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailablewithheldFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailablewithheldFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailablewithheldFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
InjectionOnshore windAvailablewithheldFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)AvailablewithheldFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)AvailablewithheldFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)AvailablewithheldFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
OfftakeLoad (any)AvailablewithheldFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailablewithheldFirm, ≤ 0 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailablewithheldFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailablewithheldFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026
BidirectionalBatteryAvailablewithheldFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 70kv26 Sep 2026

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Generation (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Generation (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Generation (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Solar PV · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Solar PV · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Solar PV · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Solar PV · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Onshore wind · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Onshore wind · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Onshore wind · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Injection · Onshore wind · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Offtake · Load (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Offtake · Load (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Offtake · Load (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Offtake · Load (any) · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Bidirectional · Battery · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Bidirectional · Battery · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Bidirectional · Battery · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

Bidirectional · Battery · Available

Value withheld

Withheld · Pending review

The operator publishes a figure here, but its terms do not yet allow us to serve it. It is listed so you know where to look: the operator’s publication (opens the operator’s site).

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 70kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-09-26 06:44 UTC
Source health
Healthy
Licence
elia.be General terms and conditions of use (no open-data licence attached)
Decision context
Not binding · indicative · a formal connection study is required

History

Served series only

No served series has a recorded history yet.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdrm9kyxren87tc6b4msjaz8/capacity" \  -H "Authorization: Bearer gc_live_..."
AMEL 70 kV substation: grid capacity (Elia Transmission Belgium) · GridCapacity API