Substation / 36 kV

AALTR

Elia Transmission Belgium / Belgium

Latest published values

40 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Available0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available60 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available60 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available7.4 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available26.1 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
InjectionGeneration (any)Available60 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionGeneration (any)Available60 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable60 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable60 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable53.2 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
InjectionSolar PVAvailable60 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable60 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionSolar PVAvailable60 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable60 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable60 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable9.8 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
InjectionOnshore windAvailable60 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable60 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
InjectionOnshore windAvailable60 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
OfftakeLoad (any)Available0.6 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
OfftakeLoad (any)Available0.8 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
OfftakeLoad (any)Available0.9 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
OfftakeLoad (any)Available1.3 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
OfftakeLoad (any)Available1.1 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
OfftakeLoad (any)Available29.3 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
OfftakeLoad (any)Available52.1 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
OfftakeLoad (any)Available60 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 36kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFirm, ≤ 0 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
BidirectionalBatteryAvailable0 MWFlexible, ≤ 5 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
BidirectionalBatteryAvailable0.8 MWFlexible, ≤ 10 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
BidirectionalBatteryAvailable1 MWFlexible, ≤ 20 % curtailment a year2027 (2027)variant: 36kv26 Sep 2026
BidirectionalBatteryAvailable1.1 MWFirm, ≤ 0 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
BidirectionalBatteryAvailable13.6 MWFlexible, ≤ 5 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
BidirectionalBatteryAvailable44.1 MWFlexible, ≤ 10 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026
BidirectionalBatteryAvailable60 MWFlexible, ≤ 20 % curtailment a year2031 (2031)variant: 36kv17 Oct 2026

Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

7.4 MW

Granted

The operator's latest published dataset reports 7.4 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

26.1 MW

Granted

The operator's latest published dataset reports 26.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Generation (any) · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

53.2 MW

Granted

The operator's latest published dataset reports 53.2 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Solar PV · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

9.8 MW

Granted

The operator's latest published dataset reports 9.8 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Injection · Onshore wind · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

0.6 MW

Granted

The operator's latest published dataset reports 0.6 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

0.8 MW

Granted

The operator's latest published dataset reports 0.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

0.9 MW

Granted

The operator's latest published dataset reports 0.9 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

1.3 MW

Granted

The operator's latest published dataset reports 1.3 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

1.1 MW

Granted

The operator's latest published dataset reports 1.1 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

29.3 MW

Granted

The operator's latest published dataset reports 29.3 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

52.1 MW

Granted

The operator's latest published dataset reports 52.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Offtake · Load (any) · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 bc5db62de6db…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

0.8 MW

Granted

The operator's latest published dataset reports 0.8 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

1 MW

Granted

The operator's latest published dataset reports 1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2027 (2027) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-09-26 06:04 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2027/AALTR 36 · payload sha256 095918d88f36…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

1.1 MW

Granted

The operator's latest published dataset reports 1.1 MW under methodology be_elia_hcm_v2.

Firmness
Firm, ≤ 0 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
0%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

13.6 MW

Granted

The operator's latest published dataset reports 13.6 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 5 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
5%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

44.1 MW

Granted

The operator's latest published dataset reports 44.1 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 10 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: code
AALTR 36
Operator note: flexibilityLevel
10%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

Bidirectional · Battery · Available

60 MW

Granted

The operator's latest published dataset reports 60 MW under methodology be_elia_hcm_v2.

Firmness
Flexible, ≤ 20 % curtailment a year
Horizon
2031 (2031) · variant: 36kv
Methodology
be_elia_hcm_v2Elia Grid Hosting Capacity: remaining available capacity per node, profile and flexibility levelbasis operator calculated · network state n and n minus 1 · comparability class be_elia_hcm_v2Not additive across assets. The method accounts for reserved: yes · allocated: yes · pre-reserved: yes · pending requests: not stated
Operator’s date
Not stated by the operator
Retrieved / confirmed
2026-10-17 03:28 UTClast confirmed unchanged 2026-11-10 02:28 UTC
Source health
Healthy
Provenance
be_elia_hosting_capacityrecord 2031/AALTR 36 · payload sha256 585da4e24ab0…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source: Elia Transmission Belgium SA, Grid Hosting Capacity Map
Decision context
Not binding · indicative · a formal connection study is required
Operator note: at voltage level cap
true
Operator note: code
AALTR 36
Operator note: flexibilityLevel
20%_flex
Operator note: variant
36kv
Operator note: voltage kv
36

History

Served series only

Bidirectional · Battery · Available · 2027

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 0.8 MW

26 Sep 2026: 0.8 MW
26 Sep 2026range 0.8 to 0.8 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.8 MW

Time axis: when we observed each value, not the operator’s effective date.

Bidirectional · Battery · Available · 2027

current 1 MW

26 Sep 2026: 1 MW
26 Sep 2026range 1 to 1 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 0.6 MW

26 Sep 2026: 0.6 MW
26 Sep 2026range 0.6 to 0.6 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 0.8 MW

26 Sep 2026: 0.8 MW
26 Sep 2026range 0.8 to 0.8 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.8 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 0.9 MW

26 Sep 2026: 0.9 MW
26 Sep 2026range 0.9 to 0.9 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0.9 MW

Time axis: when we observed each value, not the operator’s effective date.

Offtake · Load (any) · Available · 2027

current 1.3 MW

26 Sep 2026: 1.3 MW
26 Sep 2026range 1.3 to 1.3 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current1.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 60 MW

26 Sep 2026: 60 MW
26 Sep 2026range 60 to 60 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current60 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available · 2027

current 60 MW

26 Sep 2026: 60 MW
26 Sep 2026range 60 to 60 MW11 Nov 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current60 MW

Time axis: when we observed each value, not the operator’s effective date.

The first 12 of 40 served series with a history. The history route returns every one of them.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdrm9ky9smh3fv8adaaf5y58/capacity" \  -H "Authorization: Bearer gc_live_..."