10 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated1,368.3 MWUnknownNow (snapshot)27 Jun 2026
InjectionGeneration (any)Allocated1,280 MWUnknownNow (snapshot)variant: rte27 Jun 2026
InjectionGeneration (any)Allocated88.3 MWUnknownNow (snapshot)variant: grd127 Jun 2026
InjectionGeneration (any)Available349.6 MWConditionalNow (snapshot)27 Jun 2026
InjectionGeneration (any)Available0 MWFirmNow (snapshot)variant: rte27 Jun 2026
InjectionGeneration (any)Available0 MWFirmNow (snapshot)variant: grd127 Jun 2026
InjectionGeneration (any)Connected0 MWUnknownNow (snapshot)27 Jun 2026
InjectionGeneration (any)Connected0 MWUnknownNow (snapshot)variant: rte27 Jun 2026
InjectionGeneration (any)Connected0 MWUnknownNow (snapshot)variant: grd127 Jun 2026
InjectionGeneration (any)Reserved1,717.9 MWUnknowns3renr_completion27 Jun 2026

Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

1,368.3 MW

Granted

The operator's latest published dataset reports 1368.3 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_FAS3R

Injection · Generation (any) · Allocated

1,280 MW

Granted

The operator's latest published dataset reports 1280 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_FAS3R

Injection · Generation (any) · Allocated

88.3 MW

Granted

The operator's latest published dataset reports 88.3 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_FAS3R

Injection · Generation (any) · Available

349.6 MW

Granted

The operator's latest published dataset reports 349.6 MW under methodology fr_capareseau_s3renr.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_NA

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_CDR

Injection · Generation (any) · Available

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_CDR

Injection · Generation (any) · Connected

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_ESS3R

Injection · Generation (any) · Connected

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_ESS3R

Injection · Generation (any) · Connected

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_ESS3R

Injection · Generation (any) · Reserved

1,717.9 MW

Granted

The operator's latest published dataset reports 1717.9 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
s3renr_completion
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
27 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord L.GAS · payload sha256 a9982f3624ea…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-27)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: reservation modified
08/12/2025 : -7 MW vers GRANZAY | 12/05/2025 : -12 MW vers NAINTRE | 45944 : -3 MW vers CŒUR DE CHARENTE / MELLOIS EN POITOU | 24/10/2025 : -31 MW vers MIREBEAU
Operator note: source field
INFO_CR

History

Served series only

Injection · Generation (any) · Reserved · s3renr_completion

current 1,717.9 MW

2 Oct 2026: 1,717.9 MW
2 Oct 2026range 1,717.9 to 1,717.9 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current1,717.9 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 349.6 MW

2 Oct 2026: 349.6 MW
2 Oct 2026range 349.6 to 349.6 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current349.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 1,368.3 MW

2 Oct 2026: 1,368.3 MW
2 Oct 2026range 1,368.3 to 1,368.3 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current1,368.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 1,280 MW

2 Oct 2026: 1,280 MW
2 Oct 2026range 1,280 to 1,280 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current1,280 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 88.3 MW

2 Oct 2026: 88.3 MW
2 Oct 2026range 88.3 to 88.3 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current88.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gfp99w9xvk9dvdzbp1w87m9w/capacity" \  -H "Authorization: Bearer gc_live_..."
LANDES DE GASCOGNE 225 kV substation: grid capacity (RTE Réseau de Transport d'Électricité) · GridCapacity API