Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated3.6 MWUnknownNow (snapshot)22 Jun 2026
InjectionGeneration (any)Allocated3.6 MWUnknownNow (snapshot)variant: grd122 Jun 2026
InjectionGeneration (any)Allocated0 MWUnknownNow (snapshot)variant: rte22 Jun 2026
InjectionGeneration (any)Available2 MWConditionalNow (snapshot)22 Jun 2026
InjectionGeneration (any)Available2 MWFirmNow (snapshot)variant: grd122 Jun 2026
InjectionGeneration (any)Available1 MWFirmNow (snapshot)variant: rte22 Jun 2026
InjectionGeneration (any)Connected5.4 MWUnknownNow (snapshot)22 Jun 2026
InjectionGeneration (any)Connected5.4 MWUnknownNow (snapshot)variant: grd122 Jun 2026
InjectionGeneration (any)Connected0 MWUnknownNow (snapshot)variant: rte22 Jun 2026
InjectionGeneration (any)Reserved11 MWUnknowns3renr_completion22 Jun 2026

Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

3.6 MW

Granted

The operator's latest published dataset reports 3.6 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_FAS3R

Injection · Generation (any) · Allocated

3.6 MW

Granted

The operator's latest published dataset reports 3.6 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_FAS3R

Injection · Generation (any) · Allocated

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_FAS3R

Injection · Generation (any) · Available

2 MW

Granted

The operator's latest published dataset reports 2 MW under methodology fr_capareseau_s3renr.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_NA

Injection · Generation (any) · Available

2 MW

Granted

The operator's latest published dataset reports 2 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_CDR

Injection · Generation (any) · Available

1 MW

Granted

The operator's latest published dataset reports 1 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_CDR

Injection · Generation (any) · Connected

5.4 MW

Granted

The operator's latest published dataset reports 5.4 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_ESS3R

Injection · Generation (any) · Connected

5.4 MW

Granted

The operator's latest published dataset reports 5.4 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_ESS3R

Injection · Generation (any) · Connected

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_ESS3R

Injection · Generation (any) · Reserved

11 MW

Granted

The operator's latest published dataset reports 11 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
s3renr_completion
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
22 Jun 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord ERNEE · payload sha256 0076eea8561e…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-06-22)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: reservation modified
Derniers transferts :2025-11-14 : +2 MW depuis GORRON | 2026-01-05 : +1 MW depuis CROQUELOUP | 2026-04-20 : +1 MW depuis GORRON | 2026-06-22 : +2 MW depuis CROQUELOUP
Operator note: source field
INFO_CR

History

Served series only

Injection · Generation (any) · Reserved · s3renr_completion

current 11 MW

2 Oct 2026: 11 MW
2 Oct 2026range 11 to 11 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current11 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 2 MW

2 Oct 2026: 2 MW
2 Oct 2026range 2 to 2 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current2 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 5.4 MW

2 Oct 2026: 5.4 MW
2 Oct 2026range 5.4 to 5.4 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current5.4 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 3.6 MW

2 Oct 2026: 3.6 MW
2 Oct 2026range 3.6 to 3.6 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current3.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 1 MW

2 Oct 2026: 1 MW
2 Oct 2026range 1 to 1 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current1 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 2 MW

2 Oct 2026: 2 MW
2 Oct 2026range 2 to 2 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current2 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 5.4 MW

2 Oct 2026: 5.4 MW
2 Oct 2026range 5.4 to 5.4 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current5.4 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 3.6 MW

2 Oct 2026: 3.6 MW
2 Oct 2026range 3.6 to 3.6 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current3.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6hhy9sh58cccxmbzjvs28/capacity" \  -H "Authorization: Bearer gc_live_..."
ERNEE 90 kV substation: grid capacity (RTE Réseau de Transport d'Électricité) · GridCapacity API