Skip to content

Substation / 63 kV / transmission

BROU (BOURG-EN-BRESSE)

RTE Réseau de Transport d'Électricité / Ain, France

Latest published values

10 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated23.5 MWUnknownNow (snapshot)11 Aug 2026
InjectionGeneration (any)Allocated23.5 MWUnknownNow (snapshot)variant: grd111 Aug 2026
InjectionGeneration (any)Allocated0 MWUnknownNow (snapshot)variant: rte11 Aug 2026
InjectionGeneration (any)Available3 MWConditionalNow (snapshot)11 Aug 2026
InjectionGeneration (any)Available3 MWFirmNow (snapshot)variant: rte11 Aug 2026
InjectionGeneration (any)Available3 MWFirmNow (snapshot)variant: grd111 Aug 2026
InjectionGeneration (any)Connected8.1 MWUnknownNow (snapshot)11 Aug 2026
InjectionGeneration (any)Connected8.1 MWUnknownNow (snapshot)variant: grd111 Aug 2026
InjectionGeneration (any)Connected0 MWUnknownNow (snapshot)variant: rte11 Aug 2026
InjectionGeneration (any)Reserved34.6 MWUnknowns3renr_completion11 Aug 2026

Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

23.5 MW

Granted

The operator's latest published dataset reports 23.5 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_FAS3R

Injection · Generation (any) · Allocated

23.5 MW

Granted

The operator's latest published dataset reports 23.5 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_FAS3R

Injection · Generation (any) · Allocated

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_FAS3R

Injection · Generation (any) · Available

3 MW

Granted

The operator's latest published dataset reports 3 MW under methodology fr_capareseau_s3renr.

Firmness
Conditional
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_NA

Injection · Generation (any) · Available

3 MW

Granted

The operator's latest published dataset reports 3 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_CDR

Injection · Generation (any) · Available

3 MW

Granted

The operator's latest published dataset reports 3 MW under methodology fr_capareseau_s3renr.

Firmness
Firm
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_CDR

Injection · Generation (any) · Connected

8.1 MW

Granted

The operator's latest published dataset reports 8.1 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
INFO_ESS3R

Injection · Generation (any) · Connected

8.1 MW

Granted

The operator's latest published dataset reports 8.1 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: grd1
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: operator
Enedis
Operator note: operator slot
grd1
Operator note: source field
GRD1_ESS3R

Injection · Generation (any) · Connected

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
Now (snapshot) · variant: rte
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
RTE_ESS3R

Injection · Generation (any) · Reserved

34.6 MW

Granted

The operator's latest published dataset reports 34.6 MW under methodology fr_capareseau_s3renr.

Firmness
Unknown
Horizon
s3renr_completion
Methodology
fr_capareseau_s3renrCaparéseau S3REnR reservation, allocation and availability per poste sourcebasis operator published · network state unknown · comparability class fr_capareseau_s3renrNot additive across assets. The method accounts for reserved: not stated · allocated: yes · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Aug 2026
Retrieved / confirmed
2026-10-02 05:43 UTClast confirmed unchanged 2026-10-02 06:22 UTC
Source health
Healthy
Provenance
fr_capareseaurecord BROU · payload sha256 da6b0c6d05c2…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Source : Caparéseau (RTE et gestionnaires de réseaux de distribution), www.capareseau.fr (last updated 2026-08-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: reservation modified
Tsft +15MW le 18/03/24, Trsf de +3 MW le 30/09/24, Trsf de +3 MW le 22/05/25, Trsf de +5 MW le 07/11/25, Trsf de +4 MW le 21/07/26
Operator note: source field
INFO_CR

History

Served series only

Injection · Generation (any) · Reserved · s3renr_completion

current 34.6 MW

2 Oct 2026: 34.6 MW
2 Oct 2026range 34.6 to 34.6 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current34.6 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 3 MW

2 Oct 2026: 3 MW
2 Oct 2026range 3 to 3 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 8.1 MW

2 Oct 2026: 8.1 MW
2 Oct 2026range 8.1 to 8.1 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current8.1 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 23.5 MW

2 Oct 2026: 23.5 MW
2 Oct 2026range 23.5 to 23.5 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current23.5 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 3 MW

2 Oct 2026: 3 MW
2 Oct 2026range 3 to 3 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 0 MW

2 Oct 2026: 0 MW
2 Oct 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Available

current 3 MW

2 Oct 2026: 3 MW
2 Oct 2026range 3 to 3 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Connected

current 8.1 MW

2 Oct 2026: 8.1 MW
2 Oct 2026range 8.1 to 8.1 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current8.1 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 23.5 MW

2 Oct 2026: 23.5 MW
2 Oct 2026range 23.5 to 23.5 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
2 Oct 2026current23.5 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/substations/sub_06gdq6hfrsvtv6acc2gxnmzc14/capacity" \  -H "Authorization: Bearer gc_live_..."
BROU (BOURG-EN-BRESSE) 63 kV substation: grid capacity (RTE Réseau de Transport d'Électricité) · GridCapacity API