Skip to content

Busbar / 20 kV

ST OLIVA (GAND)

i-DE Redes Eléctricas Inteligentes, S.A.U. / Oliva, Valencia/València, Spain

Latest published values

3 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated6.3 MWUnknownNow (snapshot)11 Nov 2026
InjectionGeneration (any)Available22.33 MWUnknownNow (snapshot)11 Nov 2026
InjectionGeneration (any)Requested0.03 MWUnknownNow (snapshot)11 Nov 2026

Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

6.3 MW

Granted

The operator's latest published dataset reports 6.3 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST OLIVA (GAND):20#1 · payload sha256 2266fde48dc1…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_OCUPADA

Injection · Generation (any) · Available

22.33 MW

Granted

The operator's latest published dataset reports 22.33 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST OLIVA (GAND):20#1 · payload sha256 2266fde48dc1…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DISPONIBLE

Injection · Generation (any) · Requested

0.03 MW

Granted

The operator's latest published dataset reports 0.03 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST OLIVA (GAND):20#1 · payload sha256 2266fde48dc1…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ADMITIDA_NO_RESUELTA

History

Served series only

Injection · Generation (any) · Available

current 22.33 MW

26 Sep 2026: 22.36 MW12 Nov 2026: 22.33 MW
26 Sep 2026range 22.33 to 22.36 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202612 Nov 202622.36 MW
12 Nov 2026current22.33 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 6.3 MW

26 Sep 2026: 6.27 MW12 Nov 2026: 6.3 MW
26 Sep 2026range 6.27 to 6.3 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202612 Nov 20266.27 MW
12 Nov 2026current6.3 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested

current 0.03 MW

26 Sep 2026: 0 MW12 Nov 2026: 0.03 MW
26 Sep 2026range 0 to 0.03 MW24 Nov 2026
2 published values, as a table
Observed fromUntilValue
26 Sep 202612 Nov 20260 MW
12 Nov 2026current0.03 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/bus_06gdrjgzkxvkhaw2vp34w8hnem/capacity" \  -H "Authorization: Bearer gc_live_..."