Skip to content

Busbar / 20 kV

ST EL PALMAR

i-DE Redes Eléctricas Inteligentes, S.A.U. / Murcia, Murcia, Spain

Latest published values

3 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated27.82 MWUnknownNow (snapshot)11 Nov 2026
InjectionGeneration (any)Available9.96 MWUnknownNow (snapshot)11 Nov 2026
InjectionGeneration (any)Requested0 MWUnknownNow (snapshot)11 Nov 2026

Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

27.82 MW

Granted

The operator's latest published dataset reports 27.82 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST EL PALMAR:20#2 · payload sha256 667de38d6237…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_OCUPADA

Injection · Generation (any) · Available

9.96 MW

Granted

The operator's latest published dataset reports 9.96 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST EL PALMAR:20#2 · payload sha256 667de38d6237…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DISPONIBLE

Injection · Generation (any) · Requested

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
11 Nov 2026
Retrieved / confirmed
2026-11-12 01:53 UTClast confirmed unchanged 2026-11-22 13:05 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-001:ST EL PALMAR:20#2 · payload sha256 667de38d6237…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-11-11)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ADMITIDA_NO_RESUELTA

History

Served series only

Injection · Generation (any) · Available

current 9.96 MW

26 Sep 2026: 10.05 MW14 Oct 2026: 10 MW12 Nov 2026: 9.96 MW
26 Sep 2026range 9.96 to 10.05 MW24 Nov 2026
3 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 202610.05 MW
14 Oct 202612 Nov 202610 MW
12 Nov 2026current9.96 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 27.82 MW

26 Sep 2026: 27.72 MW14 Oct 2026: 27.78 MW12 Nov 2026: 27.82 MW
26 Sep 2026range 27.72 to 27.82 MW24 Nov 2026
3 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 202627.72 MW
14 Oct 202612 Nov 202627.78 MW
12 Nov 2026current27.82 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested

current 0 MW

26 Sep 2026: 5.06 MW14 Oct 2026: 0.06 MW12 Nov 2026: 0 MW
26 Sep 2026range 0 to 5.06 MW24 Nov 2026
3 published values, as a table
Observed fromUntilValue
26 Sep 202614 Oct 20265.06 MW
14 Oct 202612 Nov 20260.06 MW
12 Nov 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/bus_06gdrjgzkxvkhaw2vetzhx6ck4/capacity" \  -H "Authorization: Bearer gc_live_..."