Busbar / 25 kV

PALAU

Edistribución Redes Digitales, S.L.U. / Palau-solità i Plegamans, Barcelona, Spain

Latest published values

3 served · 0 withheld

Each row is what the operator’s latest published dataset reports for one combination of direction, technology, measure, firmness and horizon. Hosting-capacity figures are indicative and reflect what operators publish. They are not a connection offer; only the operator can confirm capacity for a specific request.

Latest published capacity values, one row per series
DirectionTechnologyMeasureValueFirmnessHorizonSource date
InjectionGeneration (any)Allocated104.76 MWUnknownNow (snapshot)9 Sep 2026
InjectionGeneration (any)Available59.94 MWUnknownNow (snapshot)9 Sep 2026
InjectionGeneration (any)Requested0 MWUnknownNow (snapshot)9 Sep 2026

Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)

What each value means

Methodology, both clocks, provenance and rights

Injection · Generation (any) · Allocated

104.76 MW

Granted

The operator's latest published dataset reports 104.76 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-299:PALAU:25 · payload sha256 4941b937802b…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_OCUPADA

Injection · Generation (any) · Available

59.94 MW

Granted

The operator's latest published dataset reports 59.94 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-299:PALAU:25 · payload sha256 4941b937802b…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_DISPONIBLE

Injection · Generation (any) · Requested

0 MW

Granted

The operator's latest published dataset reports 0 MW under methodology es_cnmc_gen_rdd_2026.

Firmness
Unknown
Horizon
Now (snapshot)
Methodology
es_cnmc_gen_rdd_2026Generation access capacity at the distribution networks (each DSO's figures in CNMC's map)basis operator calculated · network state unknown · comparability class es_rdd_generation_access_cir1_2021Not additive across assets. The method accounts for reserved: not stated · allocated: not stated · pre-reserved: not stated · pending requests: not stated
Operator’s date
9 Sep 2026
Retrieved / confirmed
2026-09-26 05:57 UTClast confirmed unchanged 2026-10-02 07:46 UTC
Source health
Healthy
Provenance
es_cnmc_generation_capacityrecord rdd:R1-299:PALAU:25 · payload sha256 4941b937802b…Operator’s publication (opens the operator’s site)
Licence
Permission by telephone, reported by the owner on 2026-10-02Attribution: Origen de los datos: Comisión Nacional de los Mercados y la Competencia (CNMC) (last updated 2026-09-09)
Decision context
Not binding · indicative · a formal connection study is required
Operator note: source field
CAP_ADMITIDA_NO_RESUELTA

History

Served series only

Injection · Generation (any) · Available

current 59.94 MW

26 Sep 2026: 59.94 MW
26 Sep 2026range 59.94 to 59.94 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current59.94 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Allocated

current 104.76 MW

26 Sep 2026: 104.76 MW
26 Sep 2026range 104.76 to 104.76 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current104.76 MW

Time axis: when we observed each value, not the operator’s effective date.

Injection · Generation (any) · Requested

current 0 MW

26 Sep 2026: 0 MW
26 Sep 2026range 0 to 0 MW2 Oct 2026
1 published value, as a table
Observed fromUntilValue
26 Sep 2026current0 MW

Time axis: when we observed each value, not the operator’s effective date.

Through the API

curl "https://api.gridcapacityapi.com/v1/grid-assets/bus_06gdrjgzm5s211fk500csqymh0/capacity" \  -H "Authorization: Bearer gc_live_..."
PALAU 25 kV busbar: grid capacity (Edistribución Redes Digitales, S.L.U.) · GridCapacity API